Closed

Moura Pool Plant Room Roof Replacement

Tender ID: 598804


Tender Details

Organisation:
Tender #:
VP485490  
Status:
Closed
Publish Date:
29 October 2025
Closing Date:
12 November 2025
Closing Time:
05:00 PM (Australia/Queensland)

Tender Description

This Tender is invited by the Issuer.

Banana Shire Council is seeking to engage a contractor to remove and replace the existing roof and guttering from the Moura Pool plant room that has severe damage due to chemical exposure. The electrical wires will have already been removed by a different contractor.

The current roof and areas that already have a ceiling will need to be removed. The roof will then need to be replaced with 75mm Solar Span or equivalent product for the entirety of the roof and guttering and flashings installed. Council is open to alternative products that are suitable for protections and use in a high chemical environment. Attachments are into hardwood bolted to Bessa brick walls. Please refer to pictures.

Four (4) whirly birds are to be installed, with flashing installed according on the roof and ceiling.

The original drawings are attached for reference. The roof space is approximately 83m2, broken into several different areas.

The plant room will be in use while constructions are underway.

The contractor will be responsible for lodging, paying and gaining approval for the building application (including Form 15 for engineering).

Installation will need to be planned around the electrician removing and replacing the wiring etc.

Council encourages contractors to organise a site inspection with Council prior to submitting a quotation.

The contractor is to supply all materials, equipment and tools necessary to complete the task.

All constructions must comply with Australian Standards, including AS2927 for chlorine storage.

All finishings are to be completed by the contractor.

All materials are to be supplied by the contractor.

Access to the plant room area will be limited to the pool management team during the construction

All safety requirements under Work Health and Safety legislation must be complied with to ensure the safety of passers-by, and employees.

The contractor will be expected to tidy the work site upon completion of each stage and remove and dispose of all waste.

Any damaged caused by the contractor will be the responsibility of the contractor to repair.


Location

Queensland   :   Rockhampton