Churchill Island Bridge Phase 3 Repairs
Tender ID: 600995
Tender Details
Tender Description
Phillip island Nature Parks is seeking a suitably qualified contractor to carry out the repair works set out in Pitt & Sherry's level 2 inspection report.
Titled - Samuel Amess Drive - Churchill Island Bridge 10/02/2025.
Samuel Amess Drive which incorporates the Churchill Island Bridge is not part of the Vic Roads and Bass Coast Shire road networks , but entirely managed by the Phillip Island Nature Parks
Scope of works along with all relevant reports for phase 1 & 2 repairs are in the Specification Documents.
Scope:
Deck and Slabs (Concrete Repairs)
• Epoxy injection of cracks on cast in-situ deck (approx. 0.6m).
• Concrete patch repair to spalled precast deck slab (approx. 0.3m²).
Abutment
• Reinstate fill loss due to scouring at Abutment 2 (approx. 5m²).
• Install scour prevention measures (e.g. rock beaching or approved equivalent).
Compression Joint Seals
• Epoxy injection of cracks to nosings at Pier 8 (LHS kerb) and Abutment 2 (RHS footpath).
Bridge Railings / Barriers (Steelwork)
• Reinstate missing nuts and secure all loose railing connections.
• Spot clean, treat corrosion, and repaint corroded barrier base plates and members (approx. 10m²).
Briefings
Churchill Island Bridge site visit
A briefing session will be held at Samuel Amess Drive, Newhaven, Vic, Australia, 3925 on 28 November 2025 10:00 am.
Notes: meet at bridge
A site visit is a pre-requisite to submission and consideration of a bid.
Registration closes on 21 November 2025 01:45 pm