Closed

Jemena RFT Control Hut- Port Kembla Pipeline Project & EGP Expansion & Reversal Project

Tender ID: 475363


Tender Details

Organisation:
Tender #:
2021-0093  
Status:
Closed
Publish Date:
29 October 2021
Closing Date:
22 November 2021

Tender Description

⁠⁠⁠Jemena is currently planning to upgrade its existing Port Kembla Lateral (PKL) pipeline capabilities to strengthen the security of gas supply for the east coast gas market.

 
The proposed PKLL Project will connect to Australian Industrial Energy (AIE) proposed Port Kembla Gas Terminal and transport gas to local customers via Jemena’s Eastern Gas Pipeline (EGP).
 
The EGP was commissioned in 2000 to supply natural gas from Victoria to the Sydney region. The EGP is a DN450 pipeline with an MAOP of 14,895 kPag.
 
Jemena is undertaking the Port Kembla Pipeline Project to reverse flow the Eastern Gas Pipeline (EGP) south of the Kembla Grange Meter Station (KGMS), to allow the supply of gas into the Victorian and New South Wales gas markets from a new LNG import terminal to be based at Port Kembla.
 
There is expected to be a total of up to 500 MMSCFD of gas being injected into the EGP from the Floating Storage and Regasification Unit (FSRU) at Port Kembla. Jemena is now in the procurement phase for Long Lead Materials.
 
The aim of this procurement activity is to seek proposals in response to a Request For Tender (RFT) for the design, manufacture, installation and testing requirements for the Electrical, Instrumentation and Control Local Equipment Hut at the new Kembla Grange Metering Station which will be installed at the new Kembla Grange Metering Station, which is located at Wyllie Road, Kembla Grange, NSW.

Location

Victoria   :   Melbourne  

Similar Tenders

Active opportunities matching this tender's categories and regions.