Tender Description

⁠⁠⁠The key work elements to be delivered by the Contractor are set out below. These are not defined as separate Stages under the Contract. The prospective project scope includes but is not limited to:

New Working Accommodation Building

A new consolidated working accommodation building for the occupants of building 4, 19 and 23 in a purpose-built facility located to the north-east of the site. The new building includes parking at the ground level with working accommodation above.

Building 2 - H.A Wills Fatigue Lab/AMSTL Building

Fitout to approximately 20% of the building including additional structure and materials test cells. Additional upgrades to approximately 30% of the existing building with remedial works to the existing façade to ensure the building remains weather tight.

Building 4 - Scientific Engineering Services/Workshop

Following the relocation of the office areas from Building 4 (100% of level 1 & 20% of GF) to the new working accommodation building, repurpose the areas vacated.

This includes the removal of the redundant office fitout, cap services to this area and make good to a soft-shell state. Soft shell state includes the repair or replacement of existing ceilings and floor finishes, painting of walls and ceilings, capping and removal of existing redundant services, repair or replacements of existing in-ceiling services including lights and the relocation of such to suit a soft-shell state.

Building 17 – Guard House

Refurbishment of Building 17.

Building 23 - Working Data Centre

Following the relocation of the office portion of Building 23 to the new working accommodation building there will be a requirement to repurpose the vacated area as part of the extension of Building 23.

Building 35 - Hangar

Expansion of the existing warehouse to allow for additional storage.

Building 52 – Systems Laboratory

Strip the entire building back inclusive of the capping of existing services and removal of hazardous materials.

New office fitout including remedial works to the façade.

Building 1 & 51 – DST Group Office Accommodation

Security upgrades to the existing façade and windows.

Building 19 – Propulsion Offices Demolition

Demolition of Building 19 on completion of the New Working Accommodation.

Front Entrance – Front base Guard Shelter

Upgrade to improve site access, efficiency and traffic ingress.

Roads and Footpaths

Improvements to roads and footpaths to provide separation between the two.

HV Upgrade and Electrical Low Voltage Works

Upgrades to the Base HV & electrical LV network.

ICT

Upgrades to the Base ICT network.

Potable Water

Upgrades to the Base potable water supply.

Sewerage

Upgrades to the Base sewer network.

Stormwater

Upgrades to the Base stormwater network and supply.

Gas

Upgrades to the Base gas network.

Compressed Air

Upgrades to the Base compressed air network.

Spatial Data and Master Site Plan

Reliable, accurate and up to date spatial records of base assets and network services as a minimum standard to support FMB base planning, management of engineering assets and WHS obligations.