NWB-GEN-KC-SCM-1180 Patient Flow Management System - New Women and Babies Hospital
Tender ID: 618274
Tender Details
Tender Description
General Scope of Supply / Services
Application Specification (AS) Response Instructions
1. The Contractor must provide a response to all requirements nominated within the AS.
2. Requirements in the “Functional Brief Context” tab are considered minimum scope, based on information provided in the Functional Briefs for each site. This tab is provided for information and evaluation purposes only and should be read in conjunction with the Functional Briefs. The Contractor remains fully responsible for ensuring all requirements defined in the Functional Briefs are met for their in-scope products.
3. The expectation is that all ‘Yes’ requirements are included in the Contractor’s offer. Items identified as No are common requirements for this package, however they are not required for this package and should not be priced.
4. The items that have been identified as Must Have are considered mandatory for the package and any deviation from this requires justification.
5. The Contractor must identify and nominate any additional requirements that, in their view, are essential to deliver a commissioned and operational solution that meets the State’s Functional Brief requirements within a fully integrated network environment by Practical Completion (PC).
6. For contract compliance, all requirements or additional requirements that are agreed through the tender process will be required to be traced through to test cases and system acceptance prior to PC by the Contractor.
The Contractor will be responsible for supporting the Managing Contractor, their sub trades and furniture, fitting and equipment (FF&E) (including major medical equipment (MME) & biomedical equipment (BME) vendors and will support the integration of all Digital Systems, including digital integrations of FF&E (including MME & BME) equipment and systems where they are installed and commissioned prior to SP practical completion.
The Contractor principally works for the Managing Contractor as a trade subcontractor; and consequently, will need to lead and coordinate digital works with other trade subcontractors for their design and delivery.
The Contractor coordinates works with the Managing Contractor (MC). The Managing Contractors digital team coordinates all digital escalations through to appropriate governance forum or authoritative leads, facilitating problem resolution, and facilitating Client decision making and problem resolution activities.
The Contractor executes all their project responsibilities in conjunction with the Managing Contractor and is responsible for their own design, delivery and assurance.
The scope of this package includes but not be limited to, the supply, installation, testing, commissioning, project management and training for the following systems and services. Patient Flow Management System WBH
By Practical Completion
a. Provision of a Patient Flow Management system to each nominated area of the Functional Brief
b. Provision of all hardware, perpetual software, and licenses to operate the Patient Flow Management system.
c. Provision of Detailed Design Documentation as outlined in section 3.7.3
d. Provision of environments, system configuration and data promotion between environments
e. Provision of integrations to systems provided by the State that require an interface.
f. Provision of integrations to systems provided by the Managing Contractor that require an interface.
g. Coordination with the Client, their consultants, contractors and related organisations.
h. Provision of construction and shop drawings where required in line with the Building Information Management Execution Plan (BEP).
i. Implementation in accordance with this Scope of Works document.
j. Site specific configuration using samples of production format data (i.e. extracts from production systems, test data feeds, sample users and groups etc.)
k. Provision of sample data migrations
l. Facilitate Technical Consultation Group sessions to inform system configuration and workflows.
m. Provision of workflows
n. Moves, Adds and Changes (MAC) activities
o. Training
p. Testing
q. Defects Liability Period
Post-Practical Completion
a. Additional configuration to support technical and business go-live activities.
b. Additional data migrations to support technical and business go-live activities.
c. Additional workflow updates to support technical and business go-live activities.
d. Additional Moves, Adds and Changes to support technical and business go-live activities.
e. Support User Acceptance Testing.
f. Additional training.
g. Support technical and business go-live activities during the hyper care period.
Patient Flow Management System OPH
By Practical Completion
a. Provision of a Patient Flow Management system to each nominated area of the Functional Brief
b. Provision of all hardware, perpetual software, and licenses to operate the Patient Flow Management system.
c. Provision of Detailed Design Documentation as outlined in section 3.7.3.
d. Provision of environments, system configuration and data promotion between environments.
e. Provision of integrations to systems provided by the State that require an interface.
f. Provision of integrations to systems provided by the Managing Contractor that require an interface.
g. Coordination with the Client, their consultants, contractors and related organisations.
h. Provision of construction and shop drawings where required in line with the Building Information Management Execution Plan (BEP).
i. Implementation in accordance with this Scope of Works document.
j. Site specific configuration using samples of production format data (i.e. extracts from production systems, test data feeds, sample users and groups etc.
k. Provision of sample data migrations.
l. Facilitate Technical Consultation Group sessions to inform system configuration and workflows.
m. Provision of workflows.
n. Moves, Adds and Changes (MAC) activities.
o. Training.
p. Testing.
q. Defects Liability Period.
Post-Practical Completion
a. Additional configuration to support technical and business go-live activities.
b. Additional data migrations to support technical and business go-live activities.
c. Additional workflow updates to support technical and business go-live activities.
d. Additional Moves, Adds and Changes to support technical and business go-live activities.
e. Support User Acceptance Testing.
f. Additional training.
g. Support technical and business go-live activities during the hyper care period.
HSE Requirements
SUBCONTRACTOR shall comply with all regulations and procedures relating to Health and Safety and Environment requirements laid down by Statutory Authorities, CONTRACTOR and the
SUBCONTRACTOR’S Own Safety Manual. SUBCONTRACTOR shall maintain a highest regard of the health and safety of its own personnel and of environment and ensure that its activities do not endanger the safety of SUBCONTRACTOR’S personnel and local communities. All reasonable precautions shall be taken for the protection of the workers and of the members of public and property that might be affected by SUBCONTRACTOR’S Work/Services.
Relevant Work Experience – Subcontractors are requested to provide a list of projects demonstrating proven experience within the last 5 years. Please provide the following details for completed projects/ experience if the above criteria are met:
- Project Name
- Year the project was executed
- Operator Name
- Project Scope
- Experience operating in Western Australia
Location
Similar Tenders
Active opportunities matching this tender's categories and regions.