Closed

Construction of Chowilla Game Reserve Infrastructure

Tender ID: 600004


Tender Details

Tender #:
DEW057872  
Status:
Closed
Publish Date:
12 November 2025
Closing Date:
11 December 2025
Closing Time:
05:00 PM (Australia/South)

Tender Description

The South Australia Constraints Measures (Constraints) Project aims to remove the operational and physical constraints to the delivery of high flows up to 80 GL/day within the River Murray. Higher environmental flows within the River Murray in South Australia under the Basin Plan provide environmental benefits but pose inundation risks to low lying land and infrastructure on the floodplain. The Project at Chowilla Game Reserve aims to improve floodplain connectivity and provide greater environmental benefits from enhanced flows along the River Murray in South Australia.

The proposed construction includes works at 10 locations:

· 5 multi cell box culvert crossing structures of varying sizes to replace existing structures

· 5 sheet pile regulating structures to replace existing temporary earthen embankments.

Briefings

Site Briefing

A briefing session will be held at Chowilla Game Reserve entrance road, off Wentworth-Renmark Road Google Maps Location: -33.982108, 140.851641 – Google Maps, Chowilla, South Australia, Australia, 5341 on 12:00 pm 20 November 2025.

Notes: RSVP: to Sarah Watts by 5pm, 18 November 2025. Refer to Supplementary Conditions of Tendering SCT 2 for further details.

A site visit is a pre-requisite to submission and consideration of a bid.

Attendance at the briefing is a pre-requisite to submission and consideration of a bid.


Location