Replacement of the Cooling Towers
Tender ID: 576676
Tender Details
Tender Description
Included in the scope are: detailed design, manufacture, installation, testing, commissioning, and documentation.
Mechanical services to be delivered:
a) Condenser water distribution
b) Demolish pre-cooling heat exchanger, PHE-07. Increase the secondary chilled water flow rate to PHE-02 and add additional plates (capacity) to PHE-02 to cater for full capacity without precooling PHE-07.
c) Replacing the existing precooling Heat Exchanger (PHE-07) serving the LCW
d) Upgrades to the existing condenser water loop piping
e) Replace existing Cooling Towers 01 – 06
f) Side filtration at each cooling tower
g) Individual towns water connection to each tower
Electrical services to be delivered:
a) All connections from mechanical switch board to towers and associated equipment.
b) New Cooling tower VSD’s.
c) All modification to the main switchboard shall be carried out by ANSTO as per the tenderer’s specifications.
Inclusions:
a) Site measurement and material take-off of the mechanical piped services distribution.
b) Concept and final detailed construction drawings.
c) Supply of components and materials excluding those which are free-issued by the Purchaser.
For clarity, this includes all piping fittings (elbows, tees, unions etc), lengths of pipe/tube and all valves and other fittings specified in the Equipment List as being supplied by the mechanical contractor.
d) Clean assembly of all systems.
e) Inspection and acceptance testing as detailed in the Inspection and Test Plan (ITP).
f) Packing and shipment of materials, components and installation equipment to the Purchaser’s site.
g) Provision of safety documentation, compliance certificates, test reports etc.
h) Copies of welding qualifications / registrations for the type of work undertaken.
i) Precise works coordination through the Purchaser.
j) Commissioning, testing and certification at the Purchaser’s site.
k) Disposal of all packing materials, not using ANSTO bins.
Other Instructions:
Conditions for Participation:
1. Supplier is required to have 5 years’ experience in the design and construction of cooling towers.
2. Experience with brown field works with cooling towers, HVAC and chiller systems.
3. Integration with existing building management systems. (BMS)
4. Efficient design and construction methodologies.
5. Relevant experience with similar projects.
6. Sufficient skill capability and staffing to deliver the project.
Location
Category
Electrical Systems & Lighting & Equipment & Services : Electrical Services
Building & Facility Construction & Maintenance Services : Building & Facility Maintenance & Repairs