Design and Construction - Stawell, St Arnaud and Donald Water Pump Station (WPS) Upgrades
Tender ID: 575244
Tender Details
Tender Description
GWMWater invites tender submissions for pump station upgrades at Stawell, St Arnaud and Donald. The contract includes the following scope:
Separable Portion 1: Crowlands Road WPS, Stawell
• Design, supply and build a new acoustically insulated pump station. (4 m x 4 m)
• Design, supply and install two (2) new pump sets. (Duty – 40 L/s at 20 m head).
• Design, supply and install new switchboard.
• Preparation of functional description and completion of SCADA programming.
• Complete connections, testing and commissioning of new pump station.
• Change overhead power supply over to new pump shed.
• Remove and dispose old pump station and components.
Separable Portion 2: St Arnaud Reservoir WPS, St Arnaud
• Design, supply and install new switchboard.
• Install one (1) new pump set. (Duty - 60 L/s at 88 m) - free issued.
• Remove existing surge protection tank.
• Design, supply and install pressure reduction valve (PRV).
• Removal and disposal of old switchboard.
• Completion of SCADA programming.
• Design and supply of a temporary power supply for GWMWater operations to manually operate one (1) pump during switchboard changeover.
Separable Portion 3: Donald Sphere WPS, Donald
• Design, supply and install new switchboard.
• Removal and disposal of old switchboard.
• Completion of SCADA programming.
• Design and supply of a temporary power supply to provide power to all the site and instruments during changeover works.
Tenders shall be accepted for Separable Portion 1, Separable Portion 2 and Separable Portion 3 or any separable portions of the scope of works.
A compulsory site meeting will be held, starting at Crowlands Road WPS, Stawell on Tuesday 28 January 2025 at 11 am. Tenderers who wish to attend are to register with GWMWater’s Graduate Engineer, Avin James.
GWMWater reserves the right to accept tenders in part.
The lowest or any tender not necessarily accepted.
Design and Construction - Stawell, St Arnaud and Donald Water Pump Station (WPS) Upgrades
A briefing session will be held at Crowlands Road Water Pump Station, Stawell, Vic, Australia, 3380 on 28 January 2025 11:00 am.
Notes: A compulsory site meeting will be held, starting at Crowlands Road WPS, Stawell on Tuesday 28 January 2025 at 11 am. Tenderers who wish to attend are to register with GWMWater’s Graduate Engineer, Avin James.
A site visit is a pre-requisite to submission and consideration of a bid.
Attendance at the briefing is a pre-requisite to submission and consideration of a bid.
Registration closes on 24 January 2025 04:00 pm
Category
Electrical Systems & Lighting & Equipment & Services : Electrical Services : Switchboards & Switchgear
Engineering & Research & Technical Based Services : Engineering Consulting Services
Building Products & Materials : Sheds & Shelters & Shade Structures
Building & Facility Construction & Maintenance Services : Commercial & Industrial Construction Services
Water & Sewage : Pipes & Valves & Fittings : Water & Sewage Pump Station Construction
Power Generation & Transmission & Distribution : Power Generation Systems
Industrial Automation & Process Control : SCADA Systems