Main Contractor for Kimi Ora Satellite Unit at Pomare School
Tender ID: 564272
Tender Details
Tender Description
The ministry of education is seeking the services of a main contractor to undertake the construction works to build a new specialist satellite unit block at Pomare School. The proposed building is being designed with simplicity, maintenance an ease of constructability in mind. This project will involve:
• Connection to inground services and site preparation
• Construction of foundations – It is yet to be confirmed whether this will be a timber subfloor or concrete slab, or raft slab on driven piles.
• There may be a degree of ground preparation required as the proposed location of the new building did once house a now removed building.
• The project is medium in scale – the physical works touching only the area concerned with the new, approximately 300m2, single story, light framed timber building.
• The work will need to be carefully planned to ensure the delivery date of March 2025 is met. Careful coordinating of product and material deliveries, human resources and construction activities will be crucial. This building is being designed with quality, rapid and efficient constructability in mind – the successful tenderer will need to be able to represent that mentality in their ROI response.
The Contractor will be engaged through an MOE major works contract (Construction contracts for professional services and works).
Project consultants are:
- Project Manager: Frank Bourke (IR Group)
- Designer / Architect: Sam Wildig (IR Group)
See documents relevant to this ROI:
- Request for Tender document
- Form of Tender Part A
- MOE Major Works Contract - which the successful respondent will be required to sign
- KO Pomare Satellite Unit - ROI Drawings
- Police Vetting Form, which all successful respondent workers will be required to complete in order to work on the school site
Location
Similar Tenders
Active opportunities matching this tender's categories and regions.