Re-Tiling 50M Pool at Gladstone Aquatic Centre
Tender ID: 551244
Tender Details
Tender Description
GRC requires a suitably qualified Contractor to complete a Design and Installation Works required for the re-tiling of the existing 50m commercial pool which forms part of the Gladstone Aquatic Centre (GAC).
The GAC is a significant GRC asset and is used by the Gladstone community daily. The original 50m Memorial Swimming Centre was constructed in circa 1975, followed by the addition of a Multi-Purpose Pool (i.e. 25m indoor pool) and building extension in 1988 and 1998 respectively.
The facility has high usage and is utilised by a wide range of user groups, including Age Care groups, Physiotherapists, Learn to Swim groups, and Swim Clubs just to name a few.
GAC hosts several assets including a 50m outdoor pool, a 25m heated indoor pool, and Aquatic Play Park.
Location
Category
Building & Facility Construction & Maintenance Services : Building & Facility Maintenance & Repairs : Commercial & Industrial Construction Services : Tiling
Civil Construction Services : Sportsfield & Playground Construction