Mirboo North Irrigation Upgrade
Tender ID: 551135
Tender Details
Tender Description
Gippsland Regional Agribusiness (GRA) is a subsidiary of Gippsland Water (GW) and currently operates a flood irrigation system in a 15 hectare (ha) property adjacent to the Mirboo North waste water treatment plant (WWTP). The water supplying the irrigation is the class C water from the winter storage lagoon. The irrigation is critical in managing the water levels in the lagoon system of the WWTP. The current system is inefficient and requires upgrade to cater for future system demands and installation of the upgraded system will allow for irrigation of 10.9 ha of land.Gippsland Regional Agribusiness (GRA) is a subsidiary of Gippsland Water (GW) and currently operates a flood irrigation system in a 15 hectare (ha) property adjacent to the Mirboo North waste water treatment plant (WWTP). The water supplying the irrigation is the class C water from the winter storage lagoon. The irrigation is critical in managing the water levels in the lagoon system of the WWTP. The current system is inefficient and requires upgrade to cater for future system demands and installation of the upgraded system will allow for irrigation of 10.9 ha of land.Gippsland Regional Agribusiness (GRA) is a subsidiary of Gippsland Water (GW) and currently operates a flood irrigation system in a 15 hectare (ha) property adjacent to the Mirboo North waste water treatment plant (WWTP). The water supplying the irrigation is the class C water from the winter storage lagoon. The irrigation is critical in managing the water levels in the lagoon system of the WWTP. The current system is inefficient and requires upgrade to cater for future system demands and installation of the upgraded system will allow for irrigation of 10.9 ha of land.
Gippsland Water is seeking the design, supply and delivery of a new irrigation system comprising of:
- Pump station
- Floating screen and pump inlet
- 120m overall arm length self-propelled pivot for an effective 150m full radius
- 12 of 360-degree fixed Stand Sprinklers, or 180-degree impact sprinklers or approved equivalent with 25m nominal spray radius
- Wi-Fi operated controls for each sprinkler/pivot
- All required pipework
Non-mandatory site visit 09:00 hours Australian Eastern Daylight Savings Time 08/03/2024. Location will be provided on request of Peter Laird – registration and request due by 09:00 hours Australian Eastern Daylight Savings Time 07/03/2024.
Briefings
Mirboo North Irrigation Site Visit
A briefing session will be held on 8 March 2024 09:00 am.
Notes: Non-mandatory site visit. Location will be provided on request of Peter Laird. Peter.laird@gippswater.com.au
Registration closes on 7 March 2024 09:00 am