Tender Description

Introduction and Background Information

 
Tamworth Regional Council (TRC) owns and operates Tamworth Regional Airport (Airport). The Airport is a large, certified and security-controlled airport with several options available for the establishment of a new operational precinct for General Aviation use. The feasibility of these options is the subject of this Quotation.
 
The final report to Council should include environmental and operational impacts of each site, calculated quantities and costs associated with all earthworks, pavements, building and service required including fencing, and utilities, and a financial report on cost recovery
scenarios. Environmental and operational impacts should include likely wind rotor generation and site visibility related to the Airservices Australia control tower. All development options identified must comply in all aspects with CASA Mos 139 standards for aerodromes.
 
Site Description
 
The sites identified are adjacent or wholly within the existing boundaries of the Tamworth Regional Airport. The three sites are indicated in the attached map.

Site Services
 
The successful contractor will be given access to Tamworth Regional Council (TRC) site service overlay maps, but will be required to identify and cost the connection of services to the selected sites. TRC will provide site access and escort.
 
Specifications
 
The successful contractor will be required to furnish Council with a report derived from:
 
 Site inspection and survey of the proposed development sites.
 Identification of available services and estimated costs of connection.
 Estimated quantities and costs of cut, fill and pavement including vehicle access routes.
 Indicative constructions for hangars capable of accommodating single Code A type aircraft with an initial target of 4 such hangars with options for expansion or larger hangars identified.
 Environmental and operational impact statement.
 Costs recovery scenarios for consideration by TRC.
 