Closed

EII Causeway Watermain Replacement - Stage 2

Tender ID: 489676


Tender Details

Organisation:
Tender #:
EOI-01299  
Status:
Closed
Publish Date:
1 April 2022
Closing Date:
13 April 2022

Tender Description

⁠⁠⁠The existing East Intercourse Island Watermain will be installed in two stages. Stage 1 (belowground sections) will be installed by others. Phase 2 (the aboveground sections) will be installed under this expression of interest. The sections will be installed near high voltage cables.

Scope of Work

Install the aboveground MSCL pipeline sections in coordination with the electrical contractor

- The length is approximately 1,870.3 meters

- The outside diameter of the pipe is 324mm

- The pipe will be supplied by Rio Tinto.

Exclusions

-Cathodic protection

Further Notifications:

The scope of work is a summary description of goods and / or services that may be required by Rio Tinto and may be subject to change in Rio Tinto’s absolute discretion.

Your business capability statement, as stored on your portal profile, will be downloaded and referenced when the responses to the EOI are considered. Please also review the portal business details section to ensure the information, including contact email address, annual turnover and employee numbers, is current and accurate. As this is an Expression of Interest (EOI) only, the specifics of the package of work relating to breadth of scope, location and timing may be subject to change. If successful, the Supplier/s will be notified of any changes prior to award. 


Location


Similar Tenders

Open opportunities matching this tender's categories and regions.