Awarded

Seymour Waste Waster Management Facility Third Party Irrigation Stage 2 Pumping System

Tender ID: 483542


Tender Details

Organisation:
Tender #:
60/6781/21  
Status:
Awarded
Closing Date:
22 March 2022
Awarded Date:
04 May 2022

Tender Description

GVW Contractors who tender for work with a total of 100k or more will be required to have a third party certified safety system e.g. AS/NZS 4801:2001

Overall Scope of Works:

The works of this project is Staged and comprises of the design, supply, construction, testing and commissioning. Some of the design (irrigation pipeline, and preliminary pump station design) has already been undertaken. The status of the remaining staged works is summarised as follows:

  • Stage 1 (separate Corporation/Principal let AS2124 tender/contract) which is predominantly the Irrigation Pipeline works, which runs from the discharge of the existing Seymour WMF Irrigation Pump Station to the adjacent landowner’s property (David Lawrence) – the party who has agreed to take the water from the Seymour WMF.
  • Stage 2 (this AS4300 contract) is the Pump Station works within the Seymour WMF site and involves a new Irrigation Pump Station which pumps water to the adjacent landowner’s property through the Stage 1 pipeline.
  • Stage 3 (separate private contract between landowner and ThinkWater Echuca) is the On Farm Irrigation works within the landowner’s property. 

Location

Victoria   :   Melbourne