Brisbane Metro major infrastructure works - Victoria Bridge Sewer Pipelines
Tender ID: 481296
Tender Details
Organisation:
Tender #:
-
Status:
Closed
Publish Date:
25 March 2022
Closing Date:
28 March 2022
Tender Description
SPS 266 Grey Street Sewage Pump Station – Phase 2 Victoria Bridge Sewer Rising Mains
Scope of Works
Brisbane Move is seeking EOIs from suitably qualified companies for the construction of the Phase 2 Victoria Bridge Sewer Rising Mains as part of the Brisbane Metro Project. The proposed works are for the supply and installation of 3 nos grade 324mm OD, 316 stainless-steel (AS4041) schedule 40 spiral welded pipes across the Brisbane river. The 3 new stainless sewer pipes are to be installed beneath the Victoria Bridge outside of the existing box girders, utilising the existing openings in the bridge structure. In each abutment to the bridge there are manifolds to connect to the 3 pipes and existing sewer to a single pipe.
The Phase 2 scope is part of a larger sewer network allowing high flows to be pumped from an existing pump station located in South Brisbane through the newly constructed phase 1B on the Southbank side of the river (installed by others), Phase 2 this scope and Phase 3 scope on the city side (installed by others).
Once the network is connected and functioning it will provide a wet weather overflow for South Brisbane that will feed into the main Brisbane sewer network.
The awarded Subcontractor will be responsible for the whole of the infrastructure scope of works therefore partial scopes submissions may not be considered.
The scope of works comprises, but is not limited, to the following:
Inclusions
o Supply, delivery and installation of all pipes, fittings, bends, tees and valves as required by the
drawings and in accordance with the Contractor’s program
o Subcontractor is responsible for the provision and management of environmental, quality, testing,
materials, labour, supervision, and safety controls required to complete the work
o Works to be carried out in accordance with UU standards and SEQ WS&S code and SEQ D&C code
o Subcontractor must ensure compliance with all legislative requirements and conduct work in
compliance with QLD and project specifications
o Subcontractor is responsible for the provision and running of site facilities and laydown area
o Provision of shop drawings
o Make and manage permit applications with UU
o Utility locating and protection of existing services
o All connections to the existing bridge
o All temporary works engineering and certification for the methods of installation – including providing
applied loads on the structure, and pipe stresses during installation
o Provision of method statements and documentation to meet the requirements and satisfaction of the stakeholders, including TMR, MSQ (Regional Harbour Master), BCC and UU.
o Make provisions for temporary works and methods for the installation of pipe to the existing structure as required
o Methods of construction and access requirements
o Allowance for out of hour work
o Reinstatement of disturbed areas including but not limited to road reserve, footpaths, and pavements
o Survey and as-builts
o Testing and commissioning
Exclusions
o Traffic management
o Communication with the Harbour Master
o Survey Monitoring of the existing bridge
Location