Closed

Stockyard Creek Bridge Steel Deck Installation

Tender ID: 415118


Tender Details

Organisation:
Tender #:
RFQ CWA-06179-00  
Status:
Closed
Publish Date:
27 March 2020
Closing Date:
14 April 2020

Tender Description

⁠⁠⁠ABOUT THE RFQ:
ARTC is seeking a contractor to install a new steel trough deck and renew the track at Stockyard Creek bridge, 204.090kp in Benalla on the Benalla to Oaklands line. The bridge is currently a timber deck bridge with 12 spans, 9m each for a total of 108m. The current timber deck is to be removed, with the new steel deck connected to the existing girders. New rail/sleepers/ballast is to be reinstalled on the bridge. The steel deck, sleepers and rail will be supplied by ARTC.

REGISTRATION:
RFQ documents must be obtained after registration.

ENQUIRIES:
RFQ enquiries should be directed via the online forum .Please note the Tender Forum will close three days (3) from the actual Tender Close date.

SUBMISSIONS:
Completed responses must be submitted via the electronic tender box (see option below). This RFQ uses one (1) tender box.
Respondents will receive a Successful Submission Receipt timed and dated upon completion. Should assistance be required please use the online manual on the portal  


Location

Victoria   :   Barwon South West   :   Gippsland   :   Grampians   :   Hume   :   Loddon Mallee   :   Melbourne  

Similar Tenders

Open opportunities matching this tender's categories and regions.