Awarded

Construction of a new two span, two lane bridge to replace the existing bridge on the Buckland Valley Rd over the Buckland River, Buckland

Tender ID: 402983


Tender Details

Organisation:
Tender #:
-  
Status:
Awarded
Closing Date:
25 November 2019
Awarded Date:
08 February 2020

Tender Description

⁠⁠⁠The Alpine Shire requests tenders from suitably qualified and experienced contractors for the construction of a new two span, two lane bridge to replace the existing bridge on the Buckland Valley Rd over the Buckland River, Buckland.


The existing two-span bridge is to be retained and the new bridge is to be constructed on a new alignment approximately 20m downstream.


The new bridge has been designed in accordance with the requirements of AS5100-2004 with an SM1600 design load capacity. 


Location

Victoria   :   Hume