Conveyor Gravity Take-Up Upgrade Fabrication and Install - West Angelas
Tender ID: 366200
Tender Details
Tender Description
Scope of work
The Service Provider will fabricate and install two gravity take-up (GTU) winch systems (as per the design provided by Rio Tinto Iron Ore (RTIO)) on conveyors to align them with the latest RTIO standards and ensure they are compliant with the relevant statutory regulations and standards.
The scope of work is a summary description of goods and / or services that may be required by Rio Tinto and may be subject to change in Rio Tinto’s absolute discretion.