Closed

Swan Hill Outfall Sewer Rising Main Replacement

Tender ID: 362261


Tender Details

Organisation:
Tender #:
-  
Status:
Closed
Publish Date:
2 August 2018
Closing Date:
7 September 2018

Tender Description

⁠⁠⁠Installation and commissioning of approximately 3.9 km of buried 450 mm diameter GRP sewer main. The pipe will be primarily installed in an unsealed road reserve with a portion running through open land owned by Lower Murray Water surrounding the Swan Hill Waste Water Treatment Plant.

The successful contractor will be required to connect the main into the existing surge manhole inlet structure and to the previously renewed section of GRP sewer outfall main.

The connections will be performed with a maximum shutdown of 4 hours to ensure that sewerage services to the city of Swan Hill are maintained.


Location

Victoria   :   Loddon Mallee  

Similar Tenders

Open opportunities matching this tender's categories and regions.