Supply and Installation of Pool Liner - 50m Pool - Newman Aquatic Centre

Tender ID: 314415


Tender Details

Organisation:
Tender #:
RFT 17-2016/17  
Status:
Closed
Publish Date:
24 May 2017
Closing Date:
14 June 2017

Tender Description

⁠⁠⁠The Newman 50m pool undertook a major refurbishment in 2001 where the existing liner was installed.

Note that it is a chlorinated pool and measures 50 metres long with an approximate width of 16.5 metres.

Pool water depths are 1.10 metres at the shallow end progressing to 1.72 metres at the point where the floor transitions into the deep end bowl. The water depth in the deep end bowl is 3.52 metres. There is an indicative sketch showing a long section of the pool included in this specification.

The wall portions of this liner installation have not been entirely successful as the top of wall fixing is coming loose in places and water has made its way behind the liner causing bulges in the liner leading to further deterioration. In addition; some of the trimming of the liner around penetrations in the pool floor are also coming apart.

The decision has been made to remove this liner altogether and in its place install a new liner. It is considered that the wall tiling, while damaged to some degree, is in good enough condition to remain visible although some patching will be required as part of these works.

This specification covers removal of the old liner and the installation of the new liner as well as some additional tasks as later identified.

It must be appreciated that this is a busy aquatic centre and therefore the 50m pool shut-down time required for these works must be kept to a minimum and because of that situation it will be necessary for the successful contractor to agree to very specific dates for shutdown and re-opening of the pool facility and it is expected that these undertakings will be met.