New Shellharbour Hospital Enabling Infrastructure – Street Lighting Relocation

Tender ID: 627085


Tender Details

Organisation:
Tender #:
26.0000129139.0824  
Status:
Closed
Publish Date:
29 September 2026
Closing Date:
27 October 2026
Closing Time:
03:00 PM (Australia/NSW)

Tender Description

⁠⁠⁠Overview

Transport for NSW is seeking a contractor to undertake street lighting relocation works associated with the New Shellharbour Hospital enabling infrastructure, at the intersection of Shellharbour Road and Dunmore Road.

Scope

The scope includes removal, replacement and new installation of street lighting and associated electrical works at the intersection of Shellharbour Road and Dunmore Road, in accordance with drawing ARP6307 – Shellharbour Road – R04, including:

  • Removal of all electrical components and abandonment of existing disused ducts
  • Removal of the street light control point, poles and lanterns
  • Trenching for all new cable runs, including excavation and reinstatement
  • Compliant reinstatement of road crossings in accordance with TfNSW M209 Road Openings and Restorations
  • Reinstatement of minimum clearances around utilities within the construction footprint as per Endeavour Energy requirements, with TfNSW construction crews continuing reinstatement of the trench and local area as per design
  • Collaboration with, and notification to, TfNSW construction crews and the engineering team regarding trench construction within the construction footprint
  • Reinstatement outside the construction footprint (not under the road) with Endeavour Energy compliant material, finished with topsoil and grass coverage
  • Supply and installation of new cabling, ducting and conduit throughout, including SL, SV, LV and spares
  • Supply and installation of 14 new lanterns
  • Supply and installation of 9 new poles, 2 of which include an additional 1.5m outreach extension
  • Establishment of 3 site establishments as per Section 1.2.8 Program of Works

Contractor Requirements

  • The Contractor is responsible for physically locating and potholing utilities on site and must always keep utility plans on site
  • Implementation and operation of management systems covering quality, environment, safety, community, industrial relations, programming and records
  • All personnel engaged on the works must be appropriately trained and hold appropriate tickets
  • All Contractor personnel must attend Worker-on-Foot (WOF) training and carry the WOF card on site at all times. Training requirements are available at https://www.aapa.asn.au/training/course-registry2/safety-training-snaps-workers-on-foot/
  • The Contractor must ensure that any disturbances caused by the works, direct or otherwise, are made good prior to completion of the contracted works
  • The Contractor is responsible for all Endeavour Energy handover requirements

Contract Terms and Conditions

  • The warranty period is 12 months
  • Traffic management will be supplied by TfNSW

Location

  • Site: Intersection of Shellharbour Road and Dunmore Road, New Shellharbour Hospital
  • Map: View on Google Maps