Closed

Engineering Infrastructure Replacement - The Prince Charles Hospital - Principal Contractor

Tender ID: 626244


Tender Details

Tender #:
MNHHS200362  
Status:
Closed
Publish Date:
21 September 2026
Closing Date:
9 October 2026
Closing Time:
05:00 PM (Australia/Queensland)

Tender Description

⁠⁠⁠Overview

Metro North Hospital Health Service (MNHHS) is inviting Expressions of Interest (EOI) from suitably experienced contractors to act as Principal Contractor (PC) for the replacement of essential engineering infrastructure at The Prince Charles Hospital (TPCH).

Purpose

TPCH's essential engineering infrastructure supporting the campus, standby generation, main low voltage (LV) distribution and central chilled water plant, has reached the end of its serviceable life and requires replacement to maintain the resilience, capacity and compliance of the facility.

About

The infrastructure to be replaced serves the whole of the operational hospital campus. It must remain in service, or be supported by equivalent temporary capacity, for the duration of the works. All works will therefore be undertaken within a live, occupied clinical environment operating 24 hours a day, seven days a week, with no acceptable unplanned loss of essential power or cooling to clinical services.

JHA Consulting Engineers will provide a Schematic Design package of documents (drawings and specification), including the large engineering equipment and long lead time procurement to be undertaken by the Contractor. The Developed Design package of documents (drawings and specification) will be progressed by JHA concurrently through the ITT process. The preferred contractor/s will be requested to provide updated pricing on the updated Developed Design.

Scope

MNHHS invites EOI from suitably experienced contractors to act as PC for the replacement of essential engineering infrastructure at TPCH. The indicative scope of works comprises but is not limited to:

Electrical and standby generation

  • Removal of 4no. existing internal open set LV standby generators
  • Installation of 3no. new diesel generators including exhaust treatment, in attenuated acoustic enclosures (principal supplied) on a new external concrete slab, including a new electrical plantroom intended to house the bulk fuel system, LV generator switchboard and local communications room
  • Provision of acoustic and aesthetic screening to the broader generator compound
  • Removal of 2no. existing generator switchboards and installation of a new generator LV switchboard in the new external plantroom
  • Installation of new LV submains cabling from the new external plant room into the existing B01 and B10 generator plantrooms, to connect to the new Main Switchboards
  • Development of a detailed cutover methodology to enable the staged connection of the new Main Switchboards to the existing Main Switchboards
  • Conversion of the existing B01 and B10 Main Switchboards to serve as Main Distribution Boards
  • Replacement of 1no. mechanical services switchboard
  • Removal of existing generator radiators from roof level
  • Removal of the existing generator hall louvers including acoustic attenuation and subsequent make good
  • Provision of all associated cabling, protection, control and monitoring systems, and integration with existing site electrical distribution and the BMS
  • Establishment of a new LV Main Switchboard in Building 15, and subsequent re-supply of the existing submains (joints required)
  • Establishment of a second (small) external plantroom located broadly between Buildings 06 and 17, complete with a smaller slab for a single standby diesel generator installed in a weatherproof acoustic enclosure
  • Installation of a new LV main switchboard connected to the standby generator noted above, and subsequent provision of new submains to Buildings 06, 17, 05 and 04 (final scope and routes to be confirmed)
  • Provision of street lighting, external CCTV and external duress to suit, and minor roadway/footpath realignment necessitated by the above works

Mechanical services

  • Removal of 3no. existing water cooled chillers (ground level) and installation of 4no. new chillers with associated pumps, pipework, valves and controls
  • Removal of 3no. existing air cooled chillers (roof level) and installation of associated pumps, pipework, valves and controls to connect to the chiller hall at ground level, including any associated structural, crane and access works
  • Removal of 4no. existing cooling towers from roof level and installation of new cooling towers, including any associated structural, crane and access works
  • Modification of existing plantroom ventilation systems
  • Provision of new mechanical services switchboards (MSSB) and Building Management System (BMS) extension
  • Provision of new chilled water pipework installation in a complex, confined space environment
  • Provision of new air handling units (AHUs) and associated grilles, ductwork, pipework, controls and commissioning

Civil and structural works

  • Construction of a large external slab and generator plantroom, including associated structural, drainage, bunding, acoustic and fire separation requirements
  • Extensive civil works, including under boring and installation of pits to establish generator connections to four separate buildings across the campus
  • Associated trenching, service location and protection, reinstatement and site restoration
  • Relocation of the main water incomer and hydrant, including trenching, service location and protection, reinstatement and site restoration

General

  • All temporary works, including temporary generation and temporary cooling, required to maintain essential services capacity during changeover
  • Planning, coordination and execution of staged shutdowns, isolations, switching and energisation in an operational hospital
  • Testing, commissioning, integrated systems testing, witness testing, handover, as-built documentation, asset data and operator training
  • Discharge of all PC duties under the Work Health and Safety Regulation 2011 (Qld), including management of all subcontractors and site control
  • Finalisation of design for construction, installation and commissioning, following the Developed Design progressed by JHA Consulting Engineers, with feedback on the design able to be provided by the PC for installation

Information Requested

MNHHS is seeking to understand the level of interest, capability and capacity of the market to deliver these works in the role of PC, and requests that respondents provide details of previous or current service delivery arrangements if applicable.

Instructions to Tenderers

This Invitation will be the first stage of a multi-stage procurement process.

Location


Location


Similar Tenders

Active opportunities matching this tender's categories and regions.