Closed

EOI Construction Services — Adaptive Reuse of Fluid Dynamics Laboratory to a PC2 Laboratory

Tender ID: 625745


Tender Details

Tender #:
-  
Status:
Closed
Publish Date:
16 September 2026
Closing Date:
6 October 2026
Closing Time:
05:00 PM (Australia/NSW)

Tender Description

⁠⁠⁠Overview

Southern Cross University (SCU) invites Expressions of Interest from suitably qualified and experienced construction contractors for the provision of construct-only services for the adaptive reuse of the existing Fluid Dynamics Laboratory in Building A at the Lismore Campus into a Physical Containment Level 2 (PC2) laboratory.

Design of the Project has been progressed by others to Design Development stage. This EOI relates to construction services only; SCU is not seeking design services through this process. The successful contractor(s) engaged following the subsequent Request for Tender (RFT) will be required to construct the works in accordance with the design documentation issued for tender, and to coordinate any residual design development, shop drawings and specialist subcontractor design (e.g. mechanical exhaust/negative pressurisation, hydraulic services and joinery) required to deliver a certifiable PC2 facility.

Purpose

The purpose of this EOI is to identify a pool of contractors with the relevant experience, technical capability, capacity and financial standing to be invited to participate in a subsequent RFT process. SCU intends to use the RFT to select a single preferred builder, with the objective of executing a construction contract by the end of 2026 so that construction can commence in 2027. Submission of an EOI response does not guarantee an invitation to the RFT, and the RFT itself will be run as a separate, distinct procurement process.

Scope

The Project comprises the refurbishment of an existing approximately 320m² laboratory space within Building A of the Lismore Campus, converting it from its current use as a Fluid Dynamics teaching laboratory to a PC2-compliant laboratory suitable for microbiological and related teaching and research activities. The indicative scope, based on the current Design Development documentation, includes but is not limited to:

  • Construction of the works in accordance with the design documentation issued for tender, including coordination of any residual design development, shop drawings and specialist subcontractor design (e.g. mechanical exhaust/negative pressurisation, hydraulic services and joinery) required to deliver a certifiable PC2 facility
  • Enabling and demolition works, including removal of existing finishes, fixtures, fittings and redundant services, and protection of items to be retained
  • New partitions, doors (including a new airlock and self-closing door to the lab entrance) and a new/expanded prep and clean-up room
  • New flush, sealed, non-shedding ceiling and PC2-compliant seamless, non-slip, chemical-resistant vinyl flooring
  • Epoxy paint finish to solid walls and tiled splashbacks, and new laboratory joinery (benches, storage, biohazard/chemical storage cabinetry) using Trespa Toplab or equivalent laminate benchtops
  • New sanitary and laboratory hydraulic fixtures, including hand basins, lab sinks, hands-free/electronic taps, tempering valves, emergency eyewash stations and safety showers, and sealed floor wastes, all to WaterMark and hydraulic engineer requirements
  • Reconfigured electrical services (lighting, power, access control) and mechanical services, including exhaust for fume cupboards, negative pressurisation and connection to the existing Building Management System (BMS), to suit PC2 laboratory requirements
  • Reconfigured fire services, statutory and hazard signage, and a general-purpose audio-visual fit-out (e.g. data projector/screen, laptop connections and possible demonstration camera)
  • Supply and installation of loose furniture, fittings and equipment as indicated on the FF&E schedule, noting that specialist teaching/laboratory equipment is being procured separately by SCU and is excluded from the construction scope

Proponents should note that all fixtures, fittings, finishes and services described above and in the Design Development documentation are subject to change as the design is finalised for tender and are provided at this stage for the purpose of allowing Proponents to assess their relevant experience and capability only.

Contract Terms and Conditions

An indicative construction cost estimate of approximately $1.5 million (including preliminaries, margin, professional fees, location loading and contingency) has been prepared based on the Design Development documentation. This figure is indicative only, is provided for context, and is not a guaranteed or approved project budget.

Contractor Requirements

  • Suitably qualified and experienced construction contractor
  • Relevant experience and technical capability to deliver the Project
  • Sufficient capacity to undertake the works
  • Financial standing sufficient to be considered for inclusion in the pool invited to participate in the subsequent RFT process