Closed

Whakatane Project Future Proof - Stage 4A

Tender ID: 621355


Tender Details

Tender #:
CON001926  
Status:
Closed
Publish Date:
3 August 2026
Closing Date:
28 August 2026
Closing Time:
04:00 PM (NZ)

Tender Description

⁠⁠⁠Overview

The Bay of Plenty Regional Council is seeking a suitably qualified civil construction contractor to deliver Stage 4A of Whakatāne Project Future Proof, a key component of the ongoing flood resilience improvements along the lower Whakatāne River.

Stage 4A is located adjacent to the Whakatāne Boat Ramp and will replace and upgrade a section of the existing flood defence network while maintaining flood protection throughout construction.

Scope

The physical works include:

  • Location, protection and management of all existing services during construction
  • Establishment of the work site, temporary access arrangements, environmental controls, laydown and stockpile areas, and traffic management
  • Site clearance, including removal of vegetation, obstructions, existing pavement, kerb and channel, sections of existing floodwall, and associated water services
  • Excavation and pavement reconstruction works, including new kerb and channel, concrete surfaces, footpaths and associated reinstatement
  • Removal, relocation and reinstatement of existing water supply infrastructure and associated pipework
  • Construction of a new floodwall, including excavation, reinforced concrete footings, stitch pours and installation of precast floodwall panels
  • Design, fabrication and installation of flood gates at vehicle access locations to maintain flood protection continuity
  • Construction of service penetrations and associated seepage control and drainage measures through the flood protection structure
  • Relocation and reinstatement of streetlight poles, services and associated infrastructure
  • Earthworks, topsoiling, landscaping and full site reinstatement
  • Working alongside the public, boat ramp users, nearby businesses and stakeholders to minimise disruption throughout construction
  • Preparation and submission of as-built information, quality assurance records and all contract documentation required for completion and handover
  • Associated project management, environmental management, health and safety management, site supervision and all other works described or implied in the contract documents

Contractor Requirements

  • Contractors will be required to demonstrate robust construction methodologies that ensure flood protection can be reinstated to existing levels should a flood risk be forecast during the works

Enquiries