EOIP- Installation of HDPE Pipelines - Eva Copper Project
Tender ID: 619769
Tender Details
Tender Description
Overview
Eva Copper Mine Pty Ltd is seeking expressions of interest (EOI) from capable and experienced contractors and suppliers for the installation of HDPE pipelines at the Eva Copper Project (Package Ref: EOIP 6526).
About
Harmony is a 70-year-old mining company headquartered in South Africa and listed on the Johannesburg and New York stock exchanges. Harmony is developing the Eva Copper Mine Project (EVAMP), a greenfield, iron-oxide, copper-gold resource poised to become Queensland's largest new metal mine. Eva Copper is located on the traditional lands of the Kalkadoon People, 75km north of Cloncurry and 95km north-east of Mount Isa.
With a 15-year mine life and the potential for extension, Eva Copper is envisioned as an open pit mine with a conventional crush, two-stage grind and flotation circuit for producing copper and gold concentrates from six open-pit deposits.
Indigenous Communities
Harmony is committed to developing a diverse workforce and inclusive work environment, which includes providing training and career opportunities to local residents of the communities in which it operates. Subject to technical capabilities, this criterion will be a key consideration in the shortlisting of vendors, release of future tenders, and award of any contracts.
Project Status
Financial investment decision (FID) was obtained in late 2025, with construction expected to be completed around Q3, 2028. In addition to the mining infrastructure, project construction will include an access road, on-site accommodation village, administration buildings, maintenance, training and first-aid facilities, and all other requirements necessary for operational readiness.
Scope
The scope includes:
- Trenching and installation of 6,200m of Coextruded White HDPE Pipeline, PN12.5 DN125, along Main Access Roads
- Supply of materials and fittings for the DN125 pipeline, including 12x Bermad C35 air valves (or equivalent), 21x 316SS gate valves, 1x mechanical flow meter and other associated equipment
- Installation of 1,200m of Coextruded White HDPE Pipeline, PN16 DN110
- Supply of materials and fittings for the DN110 pipeline, including 2x Bermad C35 air valves (or equivalent), 3x 316SS gate valves and other associated equipment
- Installation of 2,000m of Black HDPE Pipeline, PN16 DN160
- Supply of materials and fittings for the DN160 pipeline, including 2x Bermad C35 air valves (or equivalent), 6x CS gate valves and other associated equipment
Contractor Requirements
This package requires, at a minimum, an organisation that can display:
- Current or previous engagement in the supply of materials to the industry
- Ability to provide current or previous client reference details for delivery of like services
- Compliance with the Project's Australian Industry Participation Plan (AIPP) requirements, available at: Eva Copper Mine AIPP Executive Summary
- A Reconciliation Action Plan (RAP) and strong commitments to the employment and development of First Nations people
Information Requested
Respondents are asked to keep their EOI submission short, specifically addressing the following in their response:
General company information
- ABN, company name, registered address
- Contact details (name, email, mobile)
- Alternate point of contact details
- Headquarters and office locations
- Company financials
- Local and indigenous engagement policies
- Prior project information and capability statement
- Safety, risk, quality, and other accreditations
Response specific to this package of work
- Proof of capabilities
- Indicative lead times and delivery durations
- Identification of critical lead time sizes and recommendation of proposed size changes, with a list of readily available sizes
- Potential sub-supplier requirements
- Other information considered essential to supporting the supplier's submission
Instructions to Respondents
EVAMP will refer to the EOIs to assist in gauging its understanding of market capability and interest. Suitable EOI registrants may be invited to submit a tender for this package.
- EOI Closing Date: 22 July 2026
- Forecast Commencement: At the time of publishing this invitation to register an EOI, it is forecast the services will be required during Q3 2026
Details of additional Project opportunities will be published on the ICN Gateway at Eva Copper Project.
The information contained in this invitation to register an EOI is indicative only and subject to change at EVAMP's discretion. It is intended to provide a brief outline of the relevant supply which may be required on the Project and should be read in conjunction with the Project Description on the ICN Gateway.
Enquiries
All communications in connection with this invitation to register an EOI for this package, including clarification regarding this package or requests for technical support in connection with the EOI or ICN Gateway, must be submitted to:
- Contact: Nimmi Pushparajan, Head of Operations, ICN Queensland
- Mobile: +61 (0) 410 816 445
- Email: nimmi.pushparajan@icnqld.org.au