Substation Civil Works - Central Queensland Transmission Projects

Tender ID: 613833


Tender Details

Organisation:
Tender #:
-  
Status:
Closed
Publish Date:
12 May 2026
Closing Date:
19 May 2026

Tender Description

⁠⁠⁠1. Erosion Control and Environmental Measures

- Implement erosion control measures, such as silt fencing, mulching, and terracing, to prevent soil erosion during and after construction.

- Adhere to all environmental regulations and guidelines to protect sensitive habitats and maintain ecological balance.

2. Culverts and Drainage

- Install culverts and establish an efficient drainage system to manage surface water runoff along the transmission line route.

- Ensure that the culverts are designed to handle water flow and prevent any water-related issues that could compromise the stability of the transmission line.

3. Concrete Works and reinforcing specific to ASNZS standards for Substations

- Undertake various concrete works, including the construction of foundation pads, anchor blocks, and other required structures.

- Use high-quality concrete materials and adhere to approved engineering standards for durability and structural integrity.

4. Surveying and Geotechnical Investigations

- Conduct detailed surveys and geotechnical investigations to assess the terrain and soil conditions along the transmission line route.

- Use the survey data to inform engineering decisions and ensure the stability and safety of the construction.

5. Quality Assurance and Inspections

- Implement rigorous quality checks throughout the construction process.

- Conduct inspections to verify compliance with Program specifications and standards.


Location

Queensland   :   Gladstone   :   Rockhampton  

Similar Tenders