Awarded

Ara Harakeke Path Upgrade

Tender ID: 613498


Tender Details

Organisation:
Tender #:
PC00445  
Status:
Awarded
Closing Date:
8 June 2026
Closing Time:
04:00 PM (NZ)
Awarded Date:
21 September 2026

Tender Description

⁠⁠⁠Overview

Porirua City Council sought a contractor to construct a raised boardwalk structure through Plimmerton Domain, where sections of the path experience intermittent flooding from the Lower Taupo Swamp and Taupo Stream. The affected section forms part of the Ara Harakeke shared path, which is itself part of Te Araroa (The Long Pathway), the trail that runs the full length of New Zealand.

Purpose

Flooding along this section of path is most acute during periods of heavy rainfall coinciding with high tides, resulting in closures and reduced safety and accessibility. The proposed works were intended to address this flooding risk while retaining an established, well used alignment that provides direct access to Plimmerton Domain and the Ara Harakeke shared path.

Objectives

  • Future proof a regionally significant shared path against climate and tidal impacts
  • Deliver year-round accessibility for the public
  • Retain an established, well used alignment providing direct access to Plimmerton Domain and the Ara Harakeke shared path

Scope

The scope includes:

  • Construction of a raised boardwalk structure through Plimmerton Domain
  • Delivery of an infrastructure upgrade of regional significance for walking and cycling
  • Working within an environmentally sensitive wetland
  • Construction of durable, resilient recreational structures

Location

Enquiries


Location

New Zealand   :   Wellington