Otara Stopbank Upgrade
Tender ID: 601739
Tender Details
Tender Description
Tenders are invited from suitably qualified construction contractors for the works described in the Scope of Works.
The project comprises two distinct portions:
- Portion 1: CH 1040 – CH 1670
- Portion 2: CH 0 – CH 1000
Each portion must be priced independently. Portion 2 is included for pricing purposes only and may be excluded at the Principal’s discretion if costs exceed the project’s budget.
The works generally include:
- Construction methodology that ensures reinstatement to the required level of flood protection (as specified by BOPRC) if a flood risk is forecast within three days.
- Staged delivery of the two separable portions without overlap.
- Site security and public safety at all times, including temporary access and diversions where required.
- Location and protection of existing services.
- Project management and site supervision, including environmental controls and traffic management.
- Stopbank works: topsoil stripping, stockpiling, borrow pit stripping, realignment, widening, and topping-up.
- Replacement and upgrade of culverts, including associated structures and reinstatement.
- Removal and reconstruction of floodwalls in accordance with design specifications.
- Compliance with Erosion and Sediment Control Plan and consent conditions.
- Groundwater management and dewatering for excavations.
- Reinstatement of six ramps along stopbanks, including bollard removal and replacement.
- Engagement with landowners and the public to minimise disruption.
- Preparation and submission of as-built drawings.
- Other miscellaneous works as described or implied in the specifications and drawings.