Closed

Semaphore Foreshore Masterplan - Early Contractor Involvement (ECI)

Tender ID: 600132


Tender Details

Tender #:
CPAE057882  
Status:
Closed
Publish Date:
13 November 2025
Closing Date:
26 November 2025
Closing Time:
02:00 PM (Australia/South)

Tender Description

The City of Port Adelaide Enfield invites submissions from interested parties to identify capacity and capability for a select process for Early Contractor Involvement (ECI) for delivery of its Semaphore Foreshore Masterplan - Early Contractor Involvement (ECI)

PROJECT SCOPE

The redevelopment of the foreshores includes a variety of works as listed below.

Demolition Works

- Demolish existing structures, including the Kiosk, North Hub toilet block, and Train Depot shed.

- Relocate the Mini Steam Train Station shed

- Remove all existing hardscape, softscape, street furniture, and fixtures

- Remove sections of the existing railway track and associated paving

- Transplant existing trees

- Remove or disconnect all aboveground and underground services including lighting, hydraulic systems, stormwater, and gas.

Landscape Items

- The main plaza area, including the paving, lighting and furniture (retaining existing monuments)

- The Promenade/Coastal Path, including promenade steps and ramp access to beach

- Train Hub – to be relocated as shown on the design drawings. Install new seating areas, surrounding paving and landscaping.

- New Activity Hub, including multi-sports courts and skate park.

- New playground for all ages, including relocation of existing palm trees.

- Water Play – inclusive of different water play elements and interactive lighting, pump and filtration system

- Supply and install all street furniture and fixtures as specified.

- All pavement areas and paths, including integrated underground services, NBN, power and water supply points

- All grass areas and garden beds to be releveled and reinstalled.

- Public art installations, integrated throughout the site, particularly the water play and promenade, with Kaurna references. 

Railway Track Realignment

- Supply and install new railway track in accordance with the design drawings.

- Relocate the existing turntable as specified in the design drawings.

- Supply and install fencing along the railway track as per the design drawings.

Buildings & Structures

- Kiosk: Reconstruct the building at a new location, incorporating additional facilities including a public toilet, Disability Changing Room, and Beach Wheelchair Storage.

- Carousel Pavilion: Upgrade external panels and replace roof sheeting.

- Train Hub: Relocate the Mini Steam Train Station shed and rebuild the Train Depot shed.

- Main Shelter: Construct one large shelter adjacent to the water play area.

- Smaller Shelters: Install shade structures designed for picnic / seating areas

- Shade Structure: Install shade structures for playground

- Toilet Facilities: Rebuild the North Hub toilet block

- Existing Picnic Shed: Upgrade the roof sheeting to improve durability and appearance

- New Storage Shed: Build new storage shed adjacent to existing Surf and Life Saving Club storage shed Civil

- Install a new stormwater system and connect it to the existing stormwater outlet, as specified in the design documentation.

- Grade the entire site in accordance with Civil plans.

Services

- Install lighting fixtures in accordance with design documentation.

- Upgrade the electrical infrastructure as specified in the design.

- Upgrade all underground services including electricity, communications, hydraulic, and associated conduits, as per the design requirements.

- Install mechanical systems to new buildings as specified in the design.

Irrigation

- Upgrade irrigation system across the entire site with existing irrigation pumping system.


Location