Closed

SH82 Waihao North Bridge and Elephant Hill Bridge Replacement - PW

Tender ID: 597492


Tender Details

Tender #:
12943  
Status:
Closed
Publish Date:
15 October 2025
Closing Date:
18 November 2025
Closing Time:
04:00 PM (NZ)

Tender Description

This is a Physical Works Contract for the construction of replacement bridges over the Waihao River (North Branch) and Elephant Hill Stream on State Highway 82 at 17/2.41 and 32/0, respectively.

The Contract Works comprise of:

• construction of new two-lane bridges spanning the Waihao River (North Branch) and Elephant Hill Stream,

• earthworks and embankment construction

• utility diversions

• drainage, pavement and surfacing construction

• vehicle barriers

• signage

• retaining walls

• landscaping

• and the deconstruction and removal of the existing bridges.

Only tenderers prequalified to Bridge Construction – Level A or B (3A or 3B) and Construction – Level A or B (4A or 4B) under the terms of NZTA’s Prequalification System are eligible to submit a tender.

Electronic copies of the RFT documentation are attached to this advertisement. All communications are to be submitted via the Q&A Portal.

All responses to tender queries/clarifications will be answered by Notice to Tenderer which will be available in the addenda.


Location

New Zealand   :   Canterbury