Jindabyne Sewerage Pump Station (SPS6) – Construction
Tender ID: 592669
Tender Details
Tender Description
The scope of works for the Jindabyne SPS6 project includes, but is not limited to:
Management Plans and Compliance Documentation:
- Provision of all required documentation for Work Health and Safety (WHS), Quality Assurance (QA), and Environmental compliance in accordance with applicable standards and project requirements.
- Development and implementation of a project-specific Traffic Management Plan (TMP).
Site Preparation:
- Undertake all required site preparation activities, including clearing, grubbing, and the stripping and stockpiling of topsoil in accordance with environmental management protocols.
- Carry out all necessary earthworks, including cut and fill operations, subgrade preparation, and site regrading to establish design levels and ensure a stable foundation for construction activities.
Construction of New Sewerage Pump Station (SPS6):
- Installation of gravity sewer and sewer rising main connection points to service infrastructure.
- Construction of a new emergency storage tank and associated valve pit.
- Installation of all associated pipework, fittings, and pumping equipment necessary for the operation of SPS6.
- Coordination with the Snowy Monaro Regional Council (SMRC) to manage all new sewer connections and associated service interface requirements.
Electrical Works:
- Supply and installation of all electrical systems including switchboards, main connections, and telemetry/control systems required for pump station operation.
Pavement Works:
- Construction of new asphaltic pavements on Road 1 and Road 2 as per the design drawings and specifications.
- Construction of Type 3 pavement on Road 3, including regrading of the area to achieve free-draining surfaces. This includes placement of DGB20 gravel only in areas requiring surface correction to address undulations and water ponding — full coverage with DGB20 is not required.
Landscape Reinstatement:
- Reinstatement of all areas disturbed by construction activities, including topsoiling, seeding, and landscaping in accordance with environmental and landscape requirements.
Decommissioning and Demolition:
- Decommissioning and removal of existing infrastructure no longer required, including the demolition and disposal of existing box culverts and any redundant services associated with the old pump station.
Location
Category
Building & Facility Construction & Maintenance Services : Landscaping
Civil Construction Services : Civil & Earthworks (General) : Demolition & Removal : Road & Streetscape Construction & Maintenance
Horticulture & Arboriculture : Horticultural Services
Water & Sewage : Pipes & Valves & Fittings : Water & Sewage Pump Station Construction : Water & Sewer Main Construction : Water Tanks
Industrial Automation & Process Control : Telemetry Networks