Closed

Noora Pipeline Upgrades 2025

Tender ID: 591025


Tender Details

Tender #:
DEW057282  
Status:
Closed
Publish Date:
31 July 2025
Closing Date:
28 August 2025
Closing Time:
05:00 PM (Australia/South)

Tender Description

The Noora pipeline has been identified as requiring upgrades to address updated operational requirements. Currently, the Noora pipeline receives and transports saline groundwater from the Renmark Area Drainage Disposal Scheme (RADDS), as well as from the Bookpurnong, Loxton, Murtho, and Pike Salt Interception Schemes (SIS) and the Pike Environmental Salinity Management System (SMS).

With the additional flows of saline groundwater from the Salt Interception Schemes (SIS), the Department has reassessed the operational requirements of the Berri Rising Mains, a component of the Noora system. As a result, the decision has been made to isolate this section to minimise the risk of environmental harm caused by the potential release of saline groundwater into the environment.

Purpose of this document

This specification is for the upgrading and replacement of assets which are critical components of the Noora pipeline system. The Contractor shall remove and dispose of existing air valves, scour valves, and associated infrastructure and replace components that meet this specification.

The scope of the services focuses on the following key areas:

• Remove and reinstall a segment of pipe and its associated components to enable the isolation of the Berri rising main.

• Replacement of assets (fire plug and scour valves) located within the Berri rising main.

• Replacement of assets (fire plug and scour valves) located within the Lyrup rising main.

To optimise lifecycle performance, reliability, and value of assets, while minimising risks and costs, ensuring alignment with organisational objectives and supporting sustainable, long-term operational efficiency. Fire plug and scour valves play a critical role in enhancing pipeline longevity, improving operational efficiency, and reducing the risks of failure.

Briefings

Noora Pipeline Upgrades 2025

A briefing session will be held at Katarapko Floodplain - Murray River National Park, Katarapko, South Australia, Australia, 5343 on 11:00 am 15 August 2025.

Notes:

Google Maps Location: https://maps.app.goo.gl/gs1QJp2Ldtp8acrw7

RSVP: Wednesday 13 August 2025

Refer to Supplementary Conditions of Tendering SCT 2 for further details

Attendance at the briefing is a pre-requisite to submission and consideration of a bid.


Location