Rail Infrastructure Upgrades - Regional Rail And New Intercity Fleet ( RIU - RR & INF )
Tender ID: 586999
Tender Details
Tender Description
Overview
In partnership with Transport for NSW, Transport for Tomorrow will be undertaking the Regional Rail and New Intercity Fleet enabling works to support the introduction of the new RR and NIF fleets.
About Transport for Tomorrow- RR Phase 1 - Central to Dubbo
- RR Phase 2 - Hornsby to Brisbane
- RR Phase 3 - Campbelltown to Melbourne
- RR Phase 4 - Singleton to Armidale, Werris Creek to Moree
- RR Phase 5 - Orange East Fork to Broken Hill, Mittagong to Canberra, Coolamon to Griffith
- RR Phase 6 - Westmead to Mount Victoria
- RR Phase 7A2 - Southern Highlands (Glenfield to Goulburn)
- Stations Works: To allow for the safe operation of the new RR fleet across the existing regional rail network, including the installation of new car markers, modification of some platforms, and assessment of impact on signalling.
- Stabling Works: To facilitate the proper stabling, refuelling, provisioning and access of the new RR fleet to allow it to operate.
- Simulator Works: To support the RR fleet training of crew which will be delivered in the simulator and the simulator to be transported on a semi-trailer.
- Turnback and Stabling Car Markers: To ensure additional car markers are installed to enable the RR fleet to be stabled, provisioned and operationally turnback at each of the locations listed in the respective sections.
- Signalling Works: The Automatic Train Protection (ATP) system installed on the Sydney Trains network was initially designed for the electric train fleet. To allow for the RR fleet to utilise the ATP system without degradation of service, additional balise groups are required to be installed or existing balise groups reprogrammed.
- New Intercity Fleet Newcastle and Central Coast Line
- New Intercity Fleet Blue Mountains Line
- New Intercity Fleet Illawarra and South Coast Line
- Stations: Changes to station infrastructure are required to support the change in Final Operating Model.
- Signalling: To allow for the safe operation of Automatic Selective Door Operation (ASDO) the works include installation or reprogramming of ASDO balises and installation or modification of existing signalling due to the change in operating model
Work Packages | Closing |
Skip Bin Hire - Regional | 30 Jun 2025 |
Wet Hire Plant - Regional | 30 Jun 2025 |
Express interest for any opportunities that may arise for this project.