Tender for Bung Yarnda Lake Tyers Aboriginal Trust Boat Ramp and Pontoon
Tender ID: 585917
Tender Details
Tender Description
Gippsland Ports invites tenders for the construction of a boat ramp, pontoon and access road at Lake Tyers Aboriginal Trust in East Gippsland Shire.
SCOPE OF WORKS:
The works covered by this Contract consists of the supply of all labour, equipment, materials, workmanship and methods of construction necessary to construct and complete the works in accordance with the drawings as specified. Should any discrepancy occur between the drawings and the actual site conditions the Contractor shall refer such discrepancy to the Project Manager before proceeding with the section of work.
The works on site must follow “Issued for Construction” documentation only. The Contractor shall provide a construction logbook to ensure easy control by all parties involved.
The Contractor shall include all necessary planning and engineering investigations necessary for all plant and procedures used. The Contractor shall establish from the relevant authorities any restrictions or particular requirements which may apply to the construction method required for the completion of the work. The Contractor shall possess all necessary permits and enforce the necessary environmental procedures while carrying-out the Works.
The Contractor shall submit for review by the Principal any temporary works necessary to allow for the Contractor’s proposed method of construction of the Works, including temporary access and/or working platform/s necessary for the construction.
The works are to be constructed to the lines and levels shown on the drawings. The material to be placed must be of uniform quality and characteristics in accordance with this Specification. The Specification should be read in conjunction with the (FOR TENDER) drawings. The construction sequence shall also be in accordance with the drawing notes.
Below is a general definition of the scope of work under this contract and not a detailed listing of each element of work required. Refer to relevant sections of this Specification for details.
- Site mobilisation and demobilisation (including transportation of personnel, construction equipment and materials)
- Removal of existing pontoon, gangway and piles and transport and unloading at Trust storage yard
- Construction of access road to new pontoon and boat ramp
- Supply and installation of pontoon, piles, gangway and abutment
- Construction of reinforced concrete approach slab to boat ramp
- Landscaping including topsoiling, hydromulching and seeding
- Construction of endwall
- Construction of boat ramp
- Miscellaneous minor works including, but not limited to, stormwater drainage, kerbs, bollards
- Removal from site and disposal of all surplus and demolished materials
- Site clean-up and rehabilitation of disturbed areas at the conclusion of works
- Rectification of defects during Defects Liability Period
- All other works as shown on Drawings and in the Specification
For further information contact the Project Manager, Mr Carl Hodgkins, on (03) 5150 0500.
Lowest or any tender not necessarily accepted.
Category
Building & Facility Construction & Maintenance Services : Concreting : Landscaping
Civil Construction Services : Bridge Construction & Maintenance : Civil & Earthworks (General) : Demolition & Removal : Kerb & Channel Construction : Marine Infrastructure : Retaining Wall Construction : Road & Streetscape Construction & Maintenance : Stormwater Harvesting & Drainage Construction
Horticulture & Arboriculture : Grounds & Garden Maintenance Services : Horticultural Services : Mulching
Marine Transport & Products & Services : Pontoons & Jetties
Fire & Safety : Road Safety Products