Tender Description

Scope of work

'Rio Tinto requires a supplier to complete earthworks, concrete, bitumen, electrical and mechanical works involved with:

1. The removal from service and disposal of two underground tanks 1x14kl in service Diesel tank and 1x 20kl previously decommissioned tank.

2. The installation of a new 55kL Tank complete with new pumping and dispensary equipment system.

The existing tanks are at the end of their serviceable life and require replacement and decommissioning.

This is a design and construct scope of works.

The upgrade will include but is not limited to:

1. Civil

- Thorough investigation of proposed work area for existing services using non-destructive excavation to pothole down to and locate all services in the area.

- Design and install plinths for 55KL fuel tank.

- Excavate and install new vehicle fuelling pad with containment sumps and raised concrete to create bunded area for fuelling.

- Install bollards and area guard rails in concrete slab for vehicle access and asset protection.

- Reinstate tank excavation and all other excavated areas necessary for the works and reinstate asphalt.

2. Electrical

- Excavate and install all associated electrical and comms conduits for fuel bowser, fob bowser activation screen, tank level transmitters, Sump fill sensors and area lighting.

- Run conduits from existing switchboards to new DB Board for the LV fuelling pad.

- Design and supply new DB board for comms and power.

- Install new DB Boards and terminate all electrical and comms.

- Commissioning and testing. Energisation, programming system, testing and commissioning of all works.

3. Mechanical

- Design procure and install all pumps, valving, pipework and bowsers necessary.

- Procure diesel tank and fuel bowsers including testing and inspection off site prior to mobilisation to site by RTIO Itinerant Plant Inspectors.

- Supply and install 55KL fuel tank.

- Safety shower fuel logon bay and other auxiliary equipment.

4. Deconstruction and Disposal

- Decommission old fuel bowsers and fuel Tank, confirm decommissioning of old fuel station.

- Tank disposal to be in accordance with AS4976 - The removal and disposal of underground petroleum storage tanks.

- 3rd Part testing of ground and excavation of soil.

Additional Scopes

In addition to the above the 6M Fuel Facility will require the addition of another LV/HV bowser & the 7M fuel facility will require decommissioning, as per the above decommissioning of the PPT Fuel Facility.

Further Notification

This scope of work is a summary description of goods and/or services that may be required by Rio Tinto and may be subject to change in Rio Tinto’s absolute discretion.

Your business capability statement, as stored on your portal profile, may be downloaded and referenced when the responses to the expression of interest are reviewed. It is recommended that Suppliers review the portal business details section to ensure all information, including contact email address, annual turnover and employee numbers, is current and accurate.

As this is an Expression of Interest (EOI) only, the specifics of the package of work relating to breadth of scope, location and timing may be subject to change. If successful, the Supplier/s will be notified of any changes prior to award.


Location


Icon
Interested to find more tenders relevant to you and your business? You can try our advanced tender search today.