Shoalhaven Material Recovery Facility - Pavement Works
Tender ID: 581939
Tender Details
Tender Description
Shoalhaven Material Recovery Facility - Pavement Works
ENQUIRIES:
Technical enquiries are to be directed to the Project Manager, Shoalhaven City Council via the online forum (see option below) or contact 1300 293 111, quoting Council file reference 78148E.
PROJECT OVERVIEW
Council is in the process of establishing the Shoalhaven Materials Recovery Facility (MRF) at its existing West Nowra Waste Management Precinct. This MRF is designed to receive mixed recyclables from the Illawarra and Shoalhaven regions, initially capable of processing up to 24,000 tonnes per year. The facility aims to divert an additional 9,000 tonnes annually of recyclable materials away from landfills.
Council's ownership and operation of this state-of-the-art MRF will offer increased adaptability in response to the ever-evolving industry. The MRF will incorporate advanced technology, including optical sorters and AI, to ensure that recovered commodities meet or exceed market standards with less than 1% contamination. Moreover, it will generate job opportunities, reduce reliance on third-party services, lower recycling costs, enhance landfill diversion rates, and contribute to the transition toward a circular economy.
PROJECT OBJECTIVE
Shoalhaven City Council is seeking to engage a suitably qualified and reputable company to undertake pavements works for the Shoalhaven Material Recovery facility. The project site requires all weather vehicular access via the installation of a number of pavement types.
PROJECT SCOPE
The project scope is to be read in conjunction with the drawings and specification provided in the request for tender.
Documents
o Drawings
▪ Civil
• Access road upgrade: C001 to C040, revision 3
• MRF building civil works: All drawings, revision 6.
▪ Architectural
• MRF building civil works: 8983-A [2].1003 & A.2000 [3]
▪ Fire
• FS09 to FS13, revision 1.
o Specifications
▪ SMRF civil specifications
Scope:
o Access road upgrade:
▪ Pavement type 1 & 2
• Cut/fill base course. Note the base course was previously placed, but not to level.
• Import and place base course. Only required if the existing material is rejected or short in quantity.
• Excavate, haul, and place in stockpile excess base material. Only required if there was excess base material provided previously.
• Supply and place/construct:
o 7mm primer seal
o AC14 wearing course
o MRF building civil works:
▪ Stormwater:
• Line B: Install final riser and pit lid
• Line C: Install final riser and pit lid
• Line E: Install final riser and pit lid
• Line RD1: Install final riser and pit lid
• Line RD2: Install final riser and pit lid
• Line S: Install 225 PVC pipe and pits but excluding pit S1 (by others)
• Construct subsurface drainage trench behind kerb on alignment KR01.
▪ Pavement type 2 – AC14:
• Cut/fill earthworks.
• Supply and place/construct:
o subbase course
o kerb, dish drain, layback, and edge strip
o base course
o class D cover boxes for fire ring main valves.
o 7mm primer seal
o AC14 wearing course
▪ Pavement type 3 – unsealed
• Supply and place/construct:
o subbase course
o base course
▪ Pavement type 4 – 2 coat seal:
• Supply and place/construct:
o subbase course
o base course
Pavement type 4 – 2 coat seal:
• Supply and place/construct:
o subbase course
o base course
o 2-coat seal wearing course
o Line marking
o Signage: Supply and install
o Road furniture - supply and install:
• bollards
• wheel stops
• Inclusions:
o Supply of materials, plant, equipment, labour, plant operators, supervision, and management.
o Set out from survey marks or model.
o All materials handling
o Compaction testing
• Exclusions:
o Supply of general fill material.
o Supply of stormwater drainage products
o Installation of pit S1.
o Bulk earthworks.
o Construction of retaining walls.
o Survey marks.
o Works-as-executed drawings.
o Independent engineering inspections and certification
Location
Category
Civil Construction Services : Civil & Earthworks (General) : Kerb & Channel Construction : Line & Pavement Marking : Road & Streetscape Construction & Maintenance : Stormwater Harvesting & Drainage Construction
Signage : Signage
Furniture & Furnishings : Road & Street Furniture