Removal of Old Diesel & Turbine Package Assets

Tender ID: 578948


Tender Details

Organisation:
Tender #:
EOI-01817  
Status:
Closed
Publish Date:
17 February 2025
Closing Date:
3 March 2025

Tender Description

⁠⁠⁠Scope of Work:

• Remove & Dispose of the old Diesel pipeline, footings, frames and associated materials from the Fuel terminal to the GTG0 turbine package. All hazardous materials will be ID prior to works starting and vendor will be required to remove and dispose of these according to the haz materials disposal guide.

• Removal of the Hopper and airlifter assembly from the Turbine Package and relocate to a safe location on site for Sell and Parker to cut up and dispose of.

• Assist Sell & Parker with the safe removal of any and all Hazardous materials as per the haz materials disposal guide being supplied by WSP.

• Removal of sections of the fencing and railing around GTG0 turbine package.

• Removal of all in ground services including all pits and cabling.

• Installation of 3 X 40 ft sea containers and 2 X 12m dome and rear wall structures. (Rio Tinto to supply)

• Install fencing and railing as per requirements. SOW to be determined once GTG0 is removed.

Further Notification:

The scope of work described is a summary of the goods and/or services that may be required by Rio Tinto. The specific requirements may change at Rio Tinto’s absolute discretion.

Your business capability statement, as stored on your portal profile, may be downloaded, and referenced when the responses to the expression of interest are reviewed. It is recommended that suppliers review the portal business details section to ensure all information, including contact email address, annual turnover, and employee numbers, is current and accurate.           

As this is an Expression of Interest (EOI) only, the specifics of the package of work relating to breadth of scope, location and timing may be subject to change. If successful, suppliers will be notified of any changes prior to award.

Your EOI response may be referenced or re-used in the next six months if a similar scope of work is required by Rio Tinto. 