Rio Tinto Iron Ore - Sustaining Capital Engineering Services
Tender ID: 572792
Tender Details
Tender Description
Across all Engineering Disciplines
Engineering & Design:
- - Order of Magnitude studies (where required)
- - Pre-Feasibility Studies
- - Feasibility Studies (inclusive of Basic & Detailed Engineering)
- - Project Engineering & Management
Support Services (inclusive of “hands-in-pockets” site support)
- - Execution/Construction Engineering Support
- - Commissioning Engineering Support
Project controls/services
- - Estimating
- - Quantity Surveying (for project costing estimate purposes)
- - Planning & Scheduling (for project schedule estimate purposes)
Contracts & Procurement (for sub-contracting specialist purposes)
The ‘across all engineering disciplines’ noted in the EOI refers to all general engineering disciplines like civil, mechanical, structural, electrical, control, piping, etc. normally prevalent within a Engineering Service provider organisation.
The “7 Programs”, within Rio Tinto Iron Sustaining Capital, being referred to are:
1. Water
- Dewatering
- Potable Water & Water Networks
2. Fixed Plant (Mechanical & Electrical) (M&E)
- Dust
- Electrical & Control Systems
- Fire Systems
- GTU Rectification
- GTU Winches
3. Fixed Plant Structural Integrity (SI)
- Falling Objects & Overhead protection
- Guarding
- Structural Integrity
4. BEC
- Bulk Earthworks & Civils
5. Non-Process Infrastructure
- Building upgrades
- Facilities
6. Marine (& Ports)
7. Rail
Further Notification
This scope of work is a summary description of goods and/or services that may be required by Rio Tinto and may be subject to change in Rio Tinto’s absolute discretion.
Your business capability statement, as stored on your portal profile, may be downloaded and referenced when the responses to the expression of interest are reviewed. It is recommended that Suppliers review the portal business details section to ensure all information, including contact email address, annual turnover and employee numbers, is current and accurate.
As this is an Expression of Interest (EOI) only, the specifics of the package of work relating to breadth of scope, location and timing may be subject to change. If successful, the Supplier/s will be notified of any changes prior to award.