The Western Harbour Tunnel Project (WHT) includes 6.5 kilometres of dual three-lane tunnels, stretching from the Warringah Freeway in Cammeray, across Sydney Harbour, to the WestConnex interchange at Rozelle, alleviating congestion on the Anzac Bridge, Sydney Harbour Bridge and Sydney Harbour Tunnel.

The Tunnel will be delivered in two packages:

- Stage 1 (delivered by John Holland CPB Contractors) includes excavation and partial civil fit out of the southern section of the tunnel between Rozelle and Birchgrove.
- Stage 2 (this project) includes the construction of approximately 4.8 kilometres of tunnels from under Birchgrove, through to the Warringah Freeway near North Sydney and tunnelling under Sydney Harbour. Stage 2 also includes the remaining civil fit out of the Stage 1 section, surface works at the North Sydney end of the tunnel, and mechanical and electrical fit out for the entire 6.5km length of the tunnel.

ACCIONA Construction Australia Pty Ltd has been appointed by Transport for NSW to deliver Stage 2 of the WHT Project.

ACCIONA is proposing that roadheaders will be used to excavate the tunnels on the northern side of Sydney Harbour between North Sydney and Balls Head. Two tunnel boring machines (TBMs) will be used to excavate the remainder of the tunnels from Birchgrove on the southern side of the Harbour through to a cavern at Balls Head where they will meet the northern roadheader tunnels.

The Stage 2 tunnelling works are outline in Figure 1 below. The orange lines indicate the TBM tunnels and the caverns where the TBMs will be launched and retrieved. While the light blue lines indicate the roadheader tunnels. The dark blue lines indicate the extent of Stage 1 works. Figure 2 demonstrates the tunnel vertical alignment from south at Birchgrove to north at Warrigah Freeway.

Further information on the project is available at nswroads.work/whtportal with an interactive portal here to provide area specific information to help you navigate the project.

PackagesClosing
RW0175 Fire Suppression Wall (P1 Cut and Cover Area)30 Jul 2025

Express interest for any opportunities that may arise for this project.