Pluto Train 1 Scarborough Modifications
Tender ID: 545178
Tender Details
Tender Description
The Pluto Train 1 Scarborough Modifications Project ("Project") comprises of modifications to the existing Woodside-operated Pluto LNG Train 1 facility and associated infrastructure ("Pluto Train 1 Facilities") to enable gas from the Scarborough Project to be processed at the Pluto Train 1 Facilities.
Following completion of the Project and once the capacity becomes available, up to 3mtpa of gas from the Scarborough Project will be processed at the Pluto Train 1 Facilities. The Project is based on a modular design of additional equipment and will be accommodated within the existing pre-disturbed Pluto LNG footprint. New facilities to be installed include a Natural Gas Liquids Unit, Nitrogen Recycle Compressor, Pluto gas custody metering, and a range of modifications to auxiliary facilities. After a competitive FEED, Kellogg Brown and Root Pty Ltd were selected as the Engineering, Procurement and Construction Management ("EPCM") Contractor for the Execute phase of the Project and were awarded an EPCM Contract on 01 September 2023.Packages | Closing |
SM002 Insulation Work Packages | 22/05/2024 |
SM003 Passive Fire Protective | 22/05/2024 |
SM004 Electrical, Instrument and Telecommunication | 22/05/2024 |
SM005 Supply of Grating Platforms, Walkways, Stairways and Ladders | 22/05/2024 |
Express interest for any opportunities that may arise for this project.
Location
Category
Electronic Components & Supplies
Engineering & Research & Technical Based Services : Land Surveys
Information & Communication Technology : Telecoms Carrier Services
Building Products & Materials : Steel Products
Water & Sewage : Pipes & Valves & Fittings
Laboratory & Measuring & Observing & Testing Equipment : Measuring & Observing & Testing Equipment