NCESS for Reliability Services 2025-27 (WA)

Tender ID: 543707

Tender Details

Tender #:
-  
Status:
Closed
Publish Date:
11 November 2023
Closing Date:
24 January 2024

Tender Description

The Coordinator of Energy has determined, under clause 3.11A.4 of the Wholesale Electricity Market (WEM) Rules, to trigger, at the request of the Australian Energy Market Operator (AEMO), a Non-Co-optimised Essential System Services (NCESS) procurement process for Reliability Services to commence on 1 October 2025 with a two-year duration.


The NCESS Trigger Submission is based on AEMO’s analysis that emerging facility availability issues are a risk to Power System Security and the effectiveness of the Reserve Capacity Mechanism (RCM) to mitigate capacity shortfalls. AEMO considers that forecast capacity to meet the 2025-26 Reserve Capacity Requirement presents a significant risk to Power System Security, which will not be fully addressed by the Reserve Capacity Mechanism (RCM) for the 2025-26 Capacity Year. As such, AEMO considers that the existing mechanisms under the WEM Rules may not be sufficient to address the identified risks. The NCESS procurement is being initiated ahead of completion of the 2023 Reserve Capacity Cycle to allow sufficient time for proponents to deliver capacity.

This procurement follows AEMO’s 2023 WEM ESOO, which presented an outlook of supply-demand indicating an urgent need for investment by capacity providers to supply the SWIS to meet the WEM reliability standard.

Expressions of Interest

AEMO is now seeking Expressions of Interest from providers with the capability to increase Injection or decrease Withdrawal at time of supply shortfall in the South West Interconnected System. This procurement process will be for the expected utilisation of up to 354 MW of Reliability Services during the 2025-2027 Capacity Years. Given the size of the identified risks, AEMO will require that each service be operationally dispatchable and will therefore set a minimum service size of 1 MW.

AEMO considers that services may be delivered by either new Registered Facilities through offer obligations for Injection or Withdrawal in the appropriate Dispatch Intervals, or by unregistered generation or load equipment activated through alternative methods.

The Expressions of Interest process presents an opportunity for respondents to provide feedback to the draft NCESS Service Specification and understand any economic or technical benefits associated with a different contract duration or a change to the commencement date.

Expressions of Interest must be submitted by email to WA.FutureSystemDesign@aemo.com.au in accordance with the Expressions of Interest form by 5:00pm AWST on Wednesday 24 January 2024.

Key ActivitiesDate
Coordinator of Energy determination to trigger NCESSMonday 23 October 2023
Call for Expressions of InterestWednesday 1 November 2023
Date and time for lodgement of Expressions of InterestThursday 30 November 2023

Call for NCESS Submissions

 Friday 22 December 2023

Date and time for lodgement of Call for Submissions

 Wednesday 24 January 2024


Location

Western Australia   :   Gascoyne   :   Goldfields/Esperance   :   Great Southern   :   Kimberley   :   Mid West   :   Peel   :   Perth Metropolitan   :   Pilbara   :   South West   :   Wheatbelt