Request for Quote Groundwater Borehole Drilling
Tender ID: 526893
Tender Details
Tender Description
Queensland Hydro are inviting Suppliers to quote for the provision of Groundwater Borehole Drilling for the for the Pioneer-Burdekin Pumped Hydro Energy Storage Project (PBPHES).
The objective of this RFQ is to establish a Standing Offer Arrangement (SOA) with a minimum of two (2) suitably qualified contractors to perform groundwater borehole drilling for the Pioneer-Burdekin PHES project.
Works to be carried out under this Contract include, but are not limited to:
- Drilling of monitoring boreholes to depths of between 6m and 60m.
- The drilling of pumping/injection test boreholes to depths of between 6m and 60m.
- The installation of monitoring standpipe instrumentation or pumping/injection test casing with the drilled bores as directed by the Engineering Geologist – Field Works.