Closed

Final Impact Assessment (FIA) Studies for Batchelor 1 Solar Farm, Batchelor 2 Solar Farm and Manton Solar Farm

Tender ID: 521853


Tender Details

Tender #:
CPO00061-22  
Status:
Closed
Publish Date:
20 March 2023
Closing Date:
10 May 2023

Tender Description

⁠⁠⁠ Power and Water Corporation (PWC) requires a specialist power system engineering consultant to undertake Final Impact Assessments (FIA) of Batchelor 1 Solar Farm, Batchelor 2 Solar Farm and Manton Solar Farm. FIA can be done by a consultant remotely. FIA is critical and extensive model assessment study required to investigate further impact of the proposed connection (or plant) on PWC network system strength and security. The consultant must have comprehensive knowledge of the PWC power network, systems, codes and regulations to ensure all requirements are met, and must have expertise knowledge of the PowerFactory software, particularly EMT modelling and associated requirements. The consultant must be available to undertake work on a short-notice and with short turnaround time which meets regulatory requirements. PWC is the first utility in Australia to use PowerFactory in order to conduct FIA studies in EMT environment.  


Location


Similar Tenders

Related tenders matching this tender's categories and regions.