Snowy 2.0 - Horizontal Directional Drilling

Tender ID: 520123

Tender Details

Organisation:
Tender #:
-  
Status:
Closed
Publish Date:
01 March 2023
Closing Date:
17 March 2023

Tender Description

The vendor is required to state its interest for the execution of the following scope of Services (but not limited to):

 
- Provision of personnel, equipment and materials for the Horizantal Directional Drilling as identified by the Contractor.
- Provision of HDD at Marica West-03 hole and installation of enveloper pipe being Fibreglass Reinforced Polymer (FRP) along the proposed alignment of 2,275 meters in length;
- The drilling of Marica West-04 hole and installation of enveloper pipe being Fibreglass Reinforced Polymer (FRP) along the proposed alignment of 2,275 meters in length by Horizontal Directional Drilling (HDD) for the installation of electrical power (copper) cable; and
- The drilling of Marica West-05 hole and installation of enveloper pipe being Fibreglass Reinforced Polymer (FRP) along the proposed alignment of 2,275 meters in length by Horizontal Directional Drilling (HDD) for the installation of water pipe of diameter 160mm inside a 300mm HDPE;
- The drilling of Marica West-06 hole and installation of enveloper pipe being Fibreglass Reinforced Polymer (FRP) along the proposed alignment of 2,275 meters in length by Horizontal Directional Drilling (HDD) for the installation industrial water pipe of diameter 160mm inside a 300mm HDPE.
- Provision of design interface and optimization with the Contractors adjoining design packages, professional and technical services,
- Provision of all plant, tools and equipment, ancillary and support equipment, labour
- Provision of Site Induction and Onboarding for all Personnel
- Provision of Plant and Equipment fit the requirements of the Project and the required scope of service. 
- Provision of enveloper pipes installation, testing and grouting for the power cables
- Provision of the copper power cables to be installed and commissioned by others
- complying at any time with all requirements relates to project in respect of Traffic Management System for transport of goods to FGJV project site as per the regulation in force in Australia during the lifetime of the Contract.
- transport of goods to site shall comply with to Chain of Responsibility requirements as per the Australian Legislation.
- monthly work progress reports indicating quantity of the services performed (including native survey files) to support the payment
claim for the contractor to review, prior to issue of each payment certificate.
- preparation and submission daily progress reports, including progress resource, man-hours, event/delay logging, etc per activity with supporting photos. Training on the tool is available on request.
- monthly report covering several items, including but not limited to: Health and Safety, Environment, Issues and Opportunities, Quality and Commercials.
- final work report including quantity, quality documents, pictures, etc. 