Closed

Olive Downs Complex - Southern Diversion Drain

Tender ID: 515868


Tender Details

Tender #:
-  
Status:
Closed
Publish Date:
11 January 2023
Closing Date:
25 January 2023

Tender Description

Expressions of Interest

 
Pembroke encourages businesses interested in performing the civil works associated with the Southern Diversion Drain for
the Project to register an expression of interest (EOI) through the ICN Gateway webpage. Pembroke encourages strong
participation of local businesses in the project.
 
Scope of Work
 
The high-level scope of work for the Southern Diversion Drain includes the following:
 
• staging, construction and maintenance, including dust suppression, of haul roads required by the Contractor for the performance of the Work
• all temporary Work as required by the Contractor to complete the Works
• survey
• excavation of the Southern Diversion Drain. The Contractor shall complete all Work necessary for the excavate the drain, including but not limited to the following:
o topsoil stripping
o testing and identification of material
o excavation of the drain (approximately 700,000m3) with material being placed in stockpiles or otherwise
directed by Pembroke
o management of water for the duration of the works
o staging of the Work Areas as agreed by the Principal’s Representative
o construction of erosion protection where required
o topsoiling, seeding and hydro mulching where required
 
• material identification and management and excavation to the lines and levels indicated in accordance with the Design Documentation
• construction of any Contractor required buildings and facilities including earthworks pads and pavements
• local area topsoil stripping and replacement
• protection and maintenance of temporary works and permanent works within the Contractor’s Site until Completion
• Level 2 Geotechnical testing, supervision and certification in accordance with AS3798 for earthworks operations in accordance with the Design Documentation
• testing of the insitu material to identify material for used elsewhere on the project
• testing of imported material for backfill and pavements
• disposal of all unsuitable or spoil material to a nominated spoil areas as agreed with Pembroke.
• Dust suppression for the duration of the works and within the Contractors work area
 
Construction water will be supplied by the Pembroke onsite, the Contractor will be responsible for collection and transport.