Transport for NSW (Roads and Maritime Projects) / Port Macquarie Southern Breakwater Construction Project
Tender ID: 513785
Tender Details
Tender Description
The Port Macquarie Southern Breakwater Project, consists of the remediation and upgrade of the southern breakwater head and southern inner river revetment, the footpath along the crest of the structure, and associated accessways, and landscaping preparation measures at the Hastings River entrance in Port Macquarie, New South Wales (NSW).
The construction activities include but are not limited to:
- Documentation required under Specifications such as the Project Management Plan including but not limited to Construction Programme, Method Statement, Quality Control Plan and relevant Safe Work Method Statements, the Contractor’s Construction Environmental Management Plan (CEMP).
- Preliminaries including but not limited to install site security fence, access gates and signboards, install site offices, connection of temporary services, survey set-out of Works by a Registered Surveyor, prepare material storage areas, provide and maintain dewatering measures for the duration of the Works as required, provide and maintain environmental, erosion and sedimentation controls for the duration of the Works as required; and, pre-construction condition assessment.
- Protection of the Works from waves, tidal action and stormwater.
- Documentation of existing signage and temporary removal and storage or temporary fixing/display to site compound fencing at locations as instructed by the Principal Representative, as required;
- Demolition of existing structures, as required.
- Earthworks including excavation and subgrade preparation works.
- Disposal of demolition and excavated materials unsuitable for reuse at an approved and suitably licensed location.
- Reuse of demolition and excavated materials in the Works where suitable (as approved by Principal’s Representative)
- Construction of the new elements including the new rock revetment upgrade, and concrete retaining walls, footpath, accessways, and landscaping (including 2 year landscaping maintenance).
- Loading and Haulage of pre stockpiled rock to the site for construction of the upgrade to the southern breakwater head and southern inner river revetment
- Quality Management of the Works.
- Environmental, Health and Safety Management of the Works.
- Traffic Management of the Works.
- Reinstall existing signage from temporary storage or fixing/display prior to practical completion at locations nominated by the Principal’s representative.
- Completion including but not limited to site reinstatement, post-construction condition assessment; site disestablishment; site clean-up and contractor’s data report.
Location
Category
Environmental & Heritage Services : Environmental Management
Security & Parking & Traffic Services & Equipment : Traffic Management & Control Services
Building & Facility Construction & Maintenance Services : Fencing
Civil Construction Services : Civil & Earthworks (General) : Demolition & Removal : Marine Infrastructure