Seymour Wastewater Management Facility (WMF) Third Party Irrigation Stage 1 Pipeline
Tender ID: 484260
Tender Details
Tender Description
All GVW Contractors who tender for work with a total of 100k or more will be required to have a third party certified safety system e.g. AS/NZS 4801:2001
This stage one works is for the Irrigation pipeline and its submains. The rising main is a DN450 PN12.5 Irrigation Pipeline with under bores (or open cut of one) of Native Vegetation (x1 or 2), a Creek (x1) under bore and Open Cut over two adjacent Gas Pipelines. Includes supply and install of submains of various smaller sizes going into the landowners on farm works. Includes wider drainage and access track upgrades.