Seymour Wastewater Management Facility (WMF) Third Party Irrigation Stage 1 Pipeline

Tender ID: 484260

Tender Details

Organisation:
Tender #:
56/6781/21  
Status:
Awarded
Closing Date:
29 March 2022
Awarded Date:

Tender Description

All GVW Contractors who tender for work with a total of 100k or more will be required to have a third party certified safety system e.g. AS/NZS 4801:2001

This stage one works is for the Irrigation pipeline and its submains. The rising main is a DN450 PN12.5 Irrigation Pipeline with under bores (or open cut of one) of Native Vegetation (x1 or 2), a Creek (x1) under bore and Open Cut over two adjacent Gas Pipelines. Includes supply and install of submains of various smaller sizes going into the landowners on farm works. Includes wider drainage and access track upgrades. 