Recycled Water Inspections
Tender ID: 466634
Tender Details
Tender Description
Barwon Water is seeking suitably experienced and qualified contractors to submit a Tender to provide recycled water inspections on properties within new ‘recycled water developments’
These inspection services for new recycled water plumbing installations are required at the following stages:
- R1 and R4 residential plumbing inspections only as directed by Barwon Water,
- 100% of R2 and R3 residential connections,
- R1 to R3 inspections are required for all Commercial connections
- R4 inspections are required for Commercial connections when directed by Barwon Water
R1 - Stage 1 (meter to dwelling) completion of pipework between the water meter and the building but before back filling
R2 - Stage 2 (rough- in) – completion of pipework rough-in inside the building but before internal wall cladding (i.e.: plasterboard) is installed
R3 - Stage 3 (final inspection) – after all plumbing work is complete but before the building is occupied and before any completion certificate has been lodged.
R4 - Post construction inspection to be carried out as directed by Barwon Water.