Scarborough Project - Rigid Spool Fabrication
Tender ID: 458089
Tender Details
Tender Description
Subsea 7 scope of work for Scarborough SURF Project involves the project management, engineering, procurement, fabrication and
installation of the following packages of work:
• 13 subsea wells 'daisy–chained' via in-line tees (ILT)
• Carbon steel flowlines, 17.5km, 13km, 12.5km.
• Gas Export RBM (circa 300 Te)
• Flexible risers connect to the FPU.
• Subsea developed with 7 wells during Phase 1 and 6 wells in Phase 2
• Phase 1 subsea infrastructure to accommodate full 13 well development
• All 6 flexible risers & one dynamic Umbilical to be installed in Phase 1 and wet parked waiting for FPU.
• 6 x FLETs, 7 x ILT’’s,
• 1 x Export Riser Base Manifold,
• 3 x 14” ID Flexible Production Risers (circa 3km),
• 3 x 14” ID Flexible Export Risers (circa 3km),
• 43km 16” NPS carbon steel flowlines in 3 sections
• 1 x Umbilical Riser,
• 7 x Static Umbilicals in Phase 1
• UTA’s, Well Jumpers and Flying Leads
• Testing and commissioning
The scope of the Structure Fabrication package includes fabrication, inspection and testing of the following:
• 1 off 32” Rigid Carbon Steel Spool
• Spreader Bar Fabrication
• Seafastening Fabrication