Sewer Rising Main Replacement for Pumping Stations G8 and G9
Tender ID: 451418
Tender Details
Tender Description
Project: SPS G8 currently pumps via a DN300 AC rising main to the DN300 GT1 variable grade sewer (VGS), ultimately discharging into the Wyoming Major (WYMJ) catchment. SPS G9 also pumps into the G8 rising main. To accommodate increased flows from the G8 pump station resulting from development in the catchment, Council plans to replace the existing DN300 VGS with a rising main along a new alignment, using the existing rail crossing and discharging in to the gravity system to WYMJ.
Enquiries: Dianne Thomas, Water and Sewer Project Manager on 0438 693 013 or email dianne.thomas@centralcoast.nsw.gov.au